Australia Set for Solar With 8 Hour BESS Backup Updated On Mon, Mar 10th, 2025 by Saurenergy Australian Infrastucture investor Quinbrook Infrastructure Partners, has announced plans to pioneer a global market first in advanced long duration energy storage solution developed in a technical collaboration with CATL, the world’s leading battery energy storage system (BESS) manufacturer. The groundbreaking storage solution, believed to be the world’s first genuine 8-hour battery at more than double […] Read more
MP Pushes To Provide Solar Pumps To 30L Farmers Over Next Three Years Updated On Fri, Mar 7th, 2025 by Saurenergy Madhya Pradesh Chief Minister Mohan Yadav has advocated for making farmers of the state self-reliant by giving solar pumps to 30 lakh farmers in the next three years. He said, “This will make our farmers not only food providers but also energy providers. Yadav said that “our government is going to provide permanent electricity connection […] Read more
₹750 Cr Budget Allocation In J&K Budget To Solarize Govt Buildings Updated On Fri, Mar 7th, 2025 by Saurenergy In Jammu and Kashmir’s (J&K) first budget as an elected government in seven years, Chief Minister and Finance Minister Omar Abdullah outlined plans to enhance the state’s solar potential. “We are promoting rooftop solar installations under the PM Surya Ghar Muft Bijli Yojana. The solarization of 22,494 government buildings, with a total capacity of 314 […] Read more
Assistant Manager- Module Process Updated On Fri, Mar 7th, 2025 by Saurenergy Responsibilities:- Responsible for improving lamination quality of the modules by meeting the lamination product /process CTQ’s. Stringer & laminator Recipe settings & troubleshooting. Documentation for new processes, WI, SOP, Process parameters Preparation of Pre lam EL data and rework monitoring and take corrective and preventative action for controlling Pre El rework. Coordinate with quality team […] Read more
Production Engineer – Module Production Updated On Fri, Mar 7th, 2025 by Saurenergy Responsibilities:- Manpower allocation/ Ensure cleaning activity of critical machines/ 100% production adherence as per plan for respective shift 5S Activity / identify safety hazard and timely closure of Near miss/incident investigation if any. Communication with PPC team with respect to production order and RM Line in charge meeting with operator Defect discussion/production output Verification of […] Read more
GUVNL Awards 250 MW Solar Tender With Greenshoe Option At ₹2.60/kWh Updated On Thu, Mar 6th, 2025 by Saurenergy GUVNL has recently concluded its 250 MW solar auction with a greenshoe option. These projects were awarded to three winners: Welspun Renewable Energy, Avaada Energy, and SAEL Industries. GUVNL issued the tender for this project in January 2025, and the results were announced within a record time of two months. As per the tender announcements, […] Read more
SECI Issues 2.7 MW Floating Solar Tender With BESS In Lakshadweep Updated On Thu, Mar 6th, 2025 by Saurenergy Soon after announcing plans to develop grid-connected Floating Solar PV (FSPV) projects at the beginning of 2025, SECI has now released a tender to build such projects in Lakshadweep. These projects will be located in two locations within the union territory —Agatti and Kavaratti—and include an optional Battery Energy Storage System (BESS). SECI has set […] Read more
Manager – HVDC Design Updated On Thu, Mar 6th, 2025 by Saurenergy The HVDC Design Manager is responsible for overseeing the design, development, and implementation of High Voltage Direct Current (HVDC) systems in power transmission projects. This role involves managing the technical aspects of HVDC design, ensuring compliance with industry standards, and coordinating cross-functional teams to deliver solutions that meet project timelines, cost constraints, and quality requirements. The HVDC […] Read more
Saurenergy Explains: AC Block vs DC Block – Battle of BESS Updated On Thu, Mar 6th, 2025 by Saurenergy Renewable energy sources struggled to become a reliable alternative to fossil-based power for long. The Utility-scale battery energy storage systems (BESS) emerged as a panacea to renewable woes, with new renewable projects now even accommodating BESS as a part of the project. The landscape of utility-scale BESS is also now witnessing a dynamic evolution, with […] Read more