Suzlon’s Order Book Changes- A Sign Of Things To Come? Updated On Tue, Apr 1st, 2025 by Saurenergy In the wake of some wind project developers pulling back on orders, Indian wind turbine manufacturer Suzlon has faced challenges. The leading Indian wind energy manufacturer surprised market watchers last Friday by announcing the cancellation and reduction of three significant orders. Order Cancellations and Reductions In its latest regulatory filing before the stock exchange, Suzlon […] Read more
Spain’s Push For Solar Manufacturing With €210 million Funding Updated On Tue, Apr 1st, 2025 by Saurenergy Under the NextGenEU initiative, Spain’s Ministry of Ecological Transition (MITECO) has awarded more than €210 million in funding to seven solar PV manufacturing projects. Called the RENOVAL programme, it is being managed by the Institute for Diversification and Energy Saving (IDAE in Spanish). It announced the results last week. The funds will be provided through […] Read more
Kosol Energie Installs Solar System At Sarangpur Dham Updated On Mon, Mar 31st, 2025 by Saurenergy Kosol Energie has successfully installed a 250 KW solar power system at Shree Gopalanand Swami Yatrik Bhavan in Sarangpur Dham, significantly enhancing energy efficiency while reducing carbon emissions. This initiative ensures a sustainable and uninterrupted power supply for the Yatrik Bhavan (Stay Facility), setting a benchmark for renewable energy adoption in spiritual spaces. The Grand […] Read more
ALMM: Goldi, Grew Navitas & MKU Holdings Add New Capacities Updated On Sat, Mar 29th, 2025 by Saurenergy A total of 13 solar module manufacturing units from the country have added new capacities in the latest Approved List of Models and Manufacturers (ALMM). The companies that added the largest capacities included Goldi Solar, Grew Energy, MKU Holdings, Navitas and Ganesh Green. The latest list, released by the Ministry of New and Renewable Energy […] Read more
UPPCL Discovers A Tariff Of Rs 2.56/kwh For 2 GW Solar Project Updated On Fri, Mar 28th, 2025 by Saurenergy Uttar Pradesh Power Corporation Limited (UPPCL) has concluded its 2 GW solar auction, awarding projects to four bidders: ReNew Solar Power, Fastnote Biofuels (Hindustan Power), and Adani Renewable Energy Holding Twelve. UPPCL released the tender for this project in February 2024 and declared the results after a year. According to the tender results, the lowest […] Read more
IREDA Secures JPY 26 Billion ECB Facility from SBI Tokyo Updated On Fri, Mar 28th, 2025 by Saurenergy Indian Renewable Energy Development Agency Limited (IREDA) has signed a Facility Agreement today for raising External Commercial Borrowing (ECB) from SBI, Tokyo Branch for JPY 26 billion, including a Green Shoe Option of JPY 10 billion. This five-year unsecured facility, with bullet payment at maturity, is set to strengthen IREDA’s global market presence. The landed […] Read more
Assistant Manager – eBoP (Wind O&M) Updated On Thu, Mar 27th, 2025 by Saurenergy Key Duties and Responsibilities:- Daily monitoring and reporting to the area and state leads about asset performance Ensure Monthly Compliance: Compliance to Integrated Management System, Compliance to Legal, Statutory requirements through ReCAT – 100%. Zero non- compliance of statutory requirement, Complete all Technical condition audit. Reinforces and leads the execution of standards, standard work and […] Read more
Manager- Solar Site Quality_Electrical Updated On Thu, Mar 27th, 2025 by Saurenergy Ensuring installations are carried out as per approved FQP’s. Supervise & Monitor quality work at project site. Prepare and revise FQAP and checklists. Ensure Quality work through our own Engineers and TPAs. Ensure that NCs are minimised and are closed quickly, and verification of RCA and Corrective actions. Imparting Job specific trainings at site. Auditing […] Read more
NHPC Floats 1.2 GW Solar Tender With 600 MWh ESS Updated On Thu, Mar 27th, 2025 by Saurenergy NHPC has issued a tender to develop a 1.2 GW solar project with a 600/2400 MWh energy storage system. It is open to accepting bids till April 24, 2025. NHPC, in its tender, mentioned that the project should include an energy storage system (ESS) of at least 0.5 MW/2 MWh capacity for each 1 MW […] Read more