2024: Germany’s Solar Production Exceeds 100 GW Mark Updated On Wed, Jan 8th, 2025 by Saurenergy At the turn of the year, Germany’s total solar output, including all solar power plants installed in the country, has now exceeded the 100 gigawatts (GW) mark. These recent projections were made by the German Solar Industry Association, based on data from the Federal Network Agency (BNetzA). The solar power plant portfolio covered around 14 […] Read more
CESC Awards 150 MW Wind-Solar Hybrid Project To Purvah Updated On Wed, Jan 8th, 2025 by Saurenergy Kolkata-based power utility supplier, Calcutta Electric Supply Corporation (CESC), recently awarded 150 MW of wind-solar hybrid project to to its subsidiary Purvah Green Power Private Limited (Purvah). This was to meant to procure power from grid-connected wind-solar hybrid power projects. The project also offers an additional 150 MW capacity under the greenshoe option. The company […] Read more
Green Jobs: Goldi Solar, Suzlon Announce Plans To Skill Workforce Updated On Tue, Jan 7th, 2025 by Saurenergy Two Indian renewable energy companies-Goldi Solar and Suzlon Energy have now announced their plans to skill the workforce for green jobs. Indian solar module manufacturer Goldi Solar has signed a Memorandum of Understanding (MoU) with SN Patel Institute of Technology, R. N. G. Patel Institute of Technology, and UKA Tarsadia University for training the future workforce […] Read more
Green Stocks Jan 6: Green Stocks Roll Over as Broader Market Slumps Updated On Mon, Jan 6th, 2025 by Saurenergy In possibly one of the toughest market days in the past 12 months, all green energy stocks in our basket faced pressure today, with most coming out badly from the selling spree. With a majority belonging to the small-cap and mid-cap space, which was particularly hard hit, the damage is all too visible. And so […] Read more
Himachal CM Announces Installation Of Solar Project In Kaza Updated On Mon, Jan 6th, 2025 by Saurenergy Himachal Pradesh (HP) Chief Minister Thakur Sukhvinder Singh Sukhu recently announced the installation of a 2 MW solar power plant in the state to improve the power supply in the tribal region of Kaza. He said that within a few months, the plant would be fully operational with the addition of a 1 MWh battery […] Read more
Manager- Materials Quality – Mechanical Updated On Thu, Jan 2nd, 2025 by Saurenergy ACCOUNTABILITIES:- Review & approval of supplier documents, MQP, Type tests , inspection reports of Steel Coils, Module mounting structures, Transmission Tower structures, various Conductors for Transmission, Construction steel, Robotic cleaning systems etc . Inspection and testing of above items by self and through TPIAs. Conducting, co ordinating and planning supplier/factory audits, product inspections and Proto […] Read more
Assistant Manager – Carbon Business Updated On Thu, Jan 2nd, 2025 by Saurenergy Conversant with carbon development process, especially with renewable energy, clean cookstoves, biodigesters, landfill methane capture, plastic recycling, clean water and similar project’s emission reduction computations, GHG accounting, familiarity with various framework of Verra, Gold Standard, GCC and other registry’s methodologies, standards, tools (Including that of CDM’s). You are expected to write PDDs, have fair understanding […] Read more
Sahaj Solar Bags Rs.36.42cr Agri Solarization Order In Tripura Updated On Thu, Jan 2nd, 2025 by Saurenergy Gujarat-based Sahaj Solar recently secured a Letter of Award (LoA) from the Tripura Renewable Energy Development Agency (TREDA) for the solarization of existing 2 HP grid-connected agricultural pumps (IPS). The company stated in a regulatory filing, “These pumps include a 5-year guarantee/warranty and an annual maintenance contract, including insurance coverage, on a turnkey basis in […] Read more
SJVN Opens Bids For 18 MW Rooftop Solar Project On Govt Buildings Updated On Thu, Jan 2nd, 2025 by Saurenergy SJVN recently released a tender to select Solar Rooftop Power Developers to set up 18.00 MW grid-connected rooftop solar PV power projects (without battery storage). SJVN is accepting bids until January 20, 2025. This project falls under the “PM Surya Ghar: Muft Bijli Yojana” scheme and will be located on 15 Union Government buildings across […] Read more