2024: Global Solar Capacity Tops 2.2 TW, With Over 600 GW New Additions Updated On Wed, Apr 16th, 2025 by Saurenergy Global cumulative solar photovoltaic (PV) capacity rose to more than 2.2 terawatts (TW) by the end of 2024, up from 1.6 TW in 2023, with over 600 GW of new systems commissioned, the International Energy Agency’s Photovoltaic Power Systems Programme (IEA PVPS) said in its latest report. “Module prices continued to drop through 2024 in […] Read more
Serentica, NTPC Sign PPA To Supply 200 MW FDRE To UP DISCOMs Updated On Tue, Apr 15th, 2025 by Saurenergy Serentica Renewables has signed a power purchase agreement with state-run NTPC Ltd to supply 200 MW of firm and dispatchable renewable energy (FDRE) to Uttar Pradesh’s distribution companies (DISCOMS). The project will combine solar, wind, and battery storage assets across multiple states to deliver on-demand renewable power, particularly during the state’s morning and evening peak […] Read more
SOFAR Debuts On Shenzhen Stock Exchange Updated On Tue, Apr 15th, 2025 by Saurenergy SOFAR, a China-based solar and energy storage solution provider, made its debut on the ChiNext Board of the Shenzhen Stock Exchange (Stock Code: 301658) on April 2. Chairman Xu Tao rang the opening bell in the presence of government officials, partners, and industry stakeholders. The listing marks support the company’s role in China’s “Dual Carbon” […] Read more
Deputy Manager – Process (Cell Manufacturing) Updated On Tue, Apr 15th, 2025 by Saurenergy To lead a certain cluster for production activities for cell manufacturing at ReNew with a focus on cost reduction and optimum utilization of Machines training & developing of the system/manpower. Roles and Responsibilities:- Handling manufacturing of Solar Cell, material management, capacity utilization, manpower management. Should have extensive knowledge of the manufacturing process of the cluster. […] Read more
TPREL Hits 10.9 GW Capacity With NTPC’s 200 MW FDRE Deal Updated On Mon, Apr 14th, 2025 by Saurenergy Tata Power Renewable Energy Limited (TPREL), signed a Power Purchase Agreement (PPA) with NTPC Limited (NTPC), to develop a 200 MW Firm and Dispatchable Renewable Energy (FDRE) project. Tata Power Company subsidiary’s FDRE project is spread across multiple locations in India and is set to be completed within 24 months. This project is expected to […] Read more
CEA Rolls Out Resource Adequacy Tool To Aid Discoms Updated On Mon, Apr 14th, 2025 by Saurenergy The Central Electricity Authority (CEA) has launched Stellar, an indigenously developed Integrated Generation, Transmission, and Storage Expansion Planning Model with Demand Response. The indigenously developed tool is specifically designed to assist the states in carrying out a comprehensive Resource Adequacy plan in line with the set guidelines issued by the Ministry of Power in June […] Read more
Top 5: Largest BESS Projects in the World in 2025 Updated On Sat, Apr 12th, 2025 by Saurenergy As large battery projects become more and more common across the world, a new initiative, BESS100 has emerged to track the largest among them all. The BESS100, an open source visual database of the 100 largest operational batteries in the world based on rated power i.e. MW, and not on installed or usable energy – […] Read more
Researchers Hint At New Ways To Boost Li-Ion Battery Capacity Updated On Fri, Apr 11th, 2025 by Saurenergy Researchers from Dongguk University have achieved a significant breakthrough in lithium-ion battery technology by developing a novel hybrid anode material. This innovative study introduces a hierarchical heterostructure composite that optimizes material interfaces at the nanoscale, resulting in remarkable enhancements in energy storage capacity and long-term cycling stability. This engineered structure integrates graphene oxide’s superior conductivity […] Read more
NTPC REL Floats Tender For 1 GW Solar BoS Package In Bikaner Updated On Thu, Apr 10th, 2025 by Saurenergy NTPC Renewable Energy Ltd (NTPC REL) has invited bids for a Balance of System (BoS) package to develop a 1 GW (2×300 MW + 2×200 MW) grid-connected solar power project in Bikaner, Rajasthan. The last date for bid submissions is April 21, 2025. The NTPC REL tender mandates the bidder to develop the project and […] Read more