Power Conversion System Updated On Thu, Apr 17th, 2025 by Saurenergy Responsibilities:- Lead the design, development, and implementation of battery energy storage systems, focusing on power conversion systems (PCS) and electrical components Manage a team of engineers and technicians to ensure the successful execution of projects within defined timelines and budget constraints Collaborate with cross-functional teams to integrate PCS and electrical systems with overall energy storage […] Read more
Head Manufacturing – Cell and Module Plant [Solar] Updated On Thu, Apr 17th, 2025 by Saurenergy Responsibilities:- Lead and manage the overall operations of the Cell & Module plant Develop and implement strategies to optimize production efficiency and meet production targets Ensure compliance with health, safety, and environmental regulations Oversee quality control processes and implement corrective actions as needed Manage plant budgets and expenses to ensure cost-effectiveness Collaborate with cross-functional teams […] Read more
We Aim To Make Solar Biz Simple & Effective: Nishant Sood Updated On Thu, Apr 17th, 2025 by Saurenergy Tell us about your journey. How do you transition from a finance background to the solar industry? Nishant Sood: I’m a mechanical engineer by background—I graduated from IIT in the early 2000s, followed by an MBA in finance. It was a fairly typical path: IIT, then IIM, and straight into investment banking. I graduated from […] Read more
BrightNight, Hero Future Energies Inks PPA With NTPC For FDRE Project Updated On Wed, Apr 16th, 2025 by Saurenergy BrightNight has signed a power purchase agreement (PPA) with state-run NTPC to supply 110 MWac of firm and dispatchable renewable energy (FDRE) over 25 years. The company said, “The energy will be delivered from a 350 MWp solar-wind hybrid project integrated with a 100 MWh battery energy storage system in Rajasthan, and connected via the […] Read more
TPREL Hits 10.9 GW Capacity With NTPC’s 200 MW FDRE Deal Updated On Mon, Apr 14th, 2025 by Saurenergy Tata Power Renewable Energy Limited (TPREL), signed a Power Purchase Agreement (PPA) with NTPC Limited (NTPC), to develop a 200 MW Firm and Dispatchable Renewable Energy (FDRE) project. Tata Power Company subsidiary’s FDRE project is spread across multiple locations in India and is set to be completed within 24 months. This project is expected to […] Read more
BRICS Now Home To 3 Of World’s Top 5 Solar Nations: EMBER Updated On Tue, Apr 8th, 2025 by Saurenergy Renewable energy drove record clean electricity growth in 2024, with solar and wind accounting for most of the gains, think tank Ember said in its latest Global Electricity Review. Renewable power sources added adding 858 TWh in 2024, 49% more than the previous high in 2022, as per the report. The study showed, “Solar was […] Read more
Production Head Updated On Mon, Apr 7th, 2025 by Saurenergy Responsibilities:- Lead the precast production team, providing guidance and support to ensure efficient and high-quality production processes. Oversee the planning and scheduling of production activities to meet project timelines and quality standards. Implement and maintain safety protocols to ensure a secure working environment for all team members. Collaborate with the engineering and design teams to […] Read more
Associate Manager -MRSS Electrical Updated On Mon, Apr 7th, 2025 by Saurenergy Responsibilities:- Design and Implementation: Lead the design, installation, and commissioning of MRSS electrical systems, ensuring compliance with industry standards and regulations. Project Management: Manage multiple electrical projects simultaneously, including budgeting, scheduling, and resource allocation. Maintenance and Troubleshooting: Oversee the maintenance, troubleshooting, and repair of MRSS electrical equipment, including transformers, switchgear, and protection systems. Safety Compliance: Ensure all electrical systems […] Read more
CERC Cuts Tariff To Rs 2.68/Unit Vs Rs 3.22/Unit Claimed For Kerala Floating Solar Updated On Mon, Apr 7th, 2025 by Saurenergy Kerala’s 90 MW Kayamkulam Floating Solar plant, owned by NTPC saw a final levelised tariff of Rs 2.68/unit approved by the CERC, versus the claim for Rs 3.22/unit claimed by NTPC. KSEBL had sought the determination of the final tariff for the 92 MW project, while expressing concerns over the provisional tariff of ₹2.94/kWh determined […] Read more