MoP Advises REIAs To Co-Locate ESS With Solar Plants In Upcoming Tenders Updated On Wed, Feb 19th, 2025 by Saurenergy The Ministry of Power (MoP) has released an advisory on the co-location of energy storage systems (ESS) with solar plants. Its latest advisory aims to incorporate a minimum of a 2-hour co-located Energy Storage System (ESS) equivalent to 10% of installed solar capacity in future tenders. The notification stated, “This requirement will help mitigate intermittency […] Read more
Sineng Electric Commissions 50MW/200MWh Microgrid BESS Updated On Fri, Feb 14th, 2025 by Saurenergy Sineng Electric has announced the commissioning of a 50MW/200MWh microgrid battery energy storage system (BESS). This source-grid-load-storage integrated project imposes stringent requirements for grid-forming energy storage solutions. As part of the 6.1 GW renewable energy base in Xinjiang, the microgrid project spans nearly 1,000 square kilometers. It operates across off-grid, grid-following, and grid-forming modes, featuring […] Read more
Prostarm Info Gets In-Principle Approval From SEBI To Launch IPO Updated On Thu, Feb 13th, 2025 by Saurenergy Navi-Mumbai-based pan-Indian power solution products company, Prostarm Info Systems has received in-principle approval from market regulator, Securities Exchange Board of India (SEBI) to launch its initial public offering (IPO). The issue comprises a fresh issue of up to 1,60,00,000 Equity Shares of face value ₹10 each and will be listed on BSE and NSE. Choice […] Read more
Lead Controls Engineer Updated On Tue, Feb 4th, 2025 by Saurenergy The Lead Controls Engineer works as part of the Power Conversion & Storage controls engineering team in an international environment and will be responsible for validation, field implementation and maintenance of GE’s Solar, BESS and Hybrid Software and Control Systems for Projects. This includes but it is not limited to AC system, DC system, Building, […] Read more
Budget 2025: Experts Expect Spur In India’s Renewable Growth Updated On Mon, Feb 3rd, 2025 by Saurenergy The 2025 Budget brought forward by Union Finance Minister Nirmala Sitharaman raised new hopes for the Indian solar sector. With an increase in the budgetary allocations for the overall solar sector and higher budgets for key schemes like PM Surya Ghar, PM-KUSUM and solar power transmission infrastructure, the industry is looking at a healthy growth […] Read more
Odisha’s RE Market Can Attract Rs.1.5 Trillion Investments: CEEW Updated On Fri, Jan 31st, 2025 by Saurenergy Odisha has the potential to create approximately 10 lakh new full-time equivalent (FTE) jobs across three green sectors — energy transition, circular economy, and bio-economy and nature-based solutions— and attract INR 3.5 lakh crore (~USD 42 billion) in investments by 2030, reveals a study by the Council on Energy, Environment and Water (CEEW). The study […] Read more
NTPC Rolls Out Long Duration CO2 BESS Technology At Kudgi Updated On Thu, Jan 30th, 2025 by Saurenergy Indian power behemoth NTPC has launched CO2 battery energy storage technology. This project is undertaken by the R&D wing of NTPC, i.e., NTPC Energy Technology Research Alliance (NETRA). NETRA would execute the project in collaboration with an India-based industrial steam turbine manufacturer, Triveni Turbine Limited, and Italian company Energy Dome. The CO2 Battery with an […] Read more
South America Solar Growth in 2024: Achievements and Challenges Updated On Wed, Jan 29th, 2025 by Saurenergy South America continued its steady solar growth over the last half-decade in particular, and overall renewable energy capacity additions in general, through the year 2024. Brazil remained the biggest market on the Latin American continent, with other nations like Chile, Colombia, and Costa Rica showing diversity in renewable progress. On the other hand, Chile’s massive […] Read more
Telangana Joins BESS Space With 250 MW/500 MWh Tender Updated On Mon, Jan 27th, 2025 by Saurenergy Telangana Genco’s (TGGENCO) latest tender seeks to select BESS developers to build 500 MWh (250 MW x 2 hours). The tender invites bids from BESS developers to establish an “on-demand” battery storage system under Tariff-based Global Competitive Bidding with Viability Gap Funding (VGF) in Telangana. TGGENCO is accepting bids until February 21, 2025. With the […] Read more