RUMSL Floats Consultancy Tender for Morena Hybrid Project Updated On Wed, Nov 16th, 2022 by Saurenergy Rewa Ultra Mega Solar (RUMSL) has floated a consultancy tender for preparing a detailed project report (DPR) to develop the Morena wind-solar hybrid project with energy storage in Madhya Pradesh. RUMSL is a partnership between Madhya Pradesh Urja Vikas Nigam and the Solar Energy Corporation of India (SECI) to build solar parks throughout the state. […] Read more
Omkareshwar 300 MW Floating Solar Tender Oversubscribed by 700 MW Updated On Mon, Oct 31st, 2022 by Saurenergy Rewa Ultra Mega’s Solar Ltd (RUMSL)- a joint venture between SECI and MUVN, that is to develop 300 MW floating solar project at the Omkareshwar Reservoir at Madhya Pradesh has been oversubscribed. The oversubscription is by 700 MW. The cumulative capacity of the project is 600 MW. That makes it the frontrunner to be the […] Read more
Various Posts for Young Professional Updated On Mon, Oct 31st, 2022 by Saurenergy SECI invites applications for various position of Young Professional from talented, innovative and dynamic candidates who are keen to demonstrate their proven academic, credential, professional achievements. Details of the same are given below: SI.N o Name of Position No. of YP Eligibility Criteria 1 YP (Hydrogen Energy) 01 Degree in Mechanical/ Chemical/ Electrical/ […] Read more
Adani Green Energy Buys 3 SPVs from Inox Green Energy Updated On Tue, Oct 11th, 2022 by Saurenergy Leading renewable energy company Adani Green Energy has revealed that it has acquired three entities from Inox Green Energy Services Limited (IGESL), a subsidiary of INOX Wind that is a wind power operation and maintenance (O&M) service provider. Each of the three entities holds 50 MW operational wind power projects at Dayapar, Gujarat. The three […] Read more
AGEL Commissions 600 MW Capacity of World’s Largest Hybrid Power Plant Updated On Fri, Sep 30th, 2022 by Saurenergy A wind-solar hybrid power plant in Jaisalmer, Rajasthan, with a 600 MW of capacity has been commissioned by Adani Green Energy (AGEL). The hybrid power project has been developed by two subsidiaries, Adani Hybrid Energy Jaisalmer Two and Adani Hybrid Energy Jaisalmer Three. According to the official statement, the project would include 150 MW of […] Read more
APTEL Permits Adani Green To Claim Carry Costs Based On Change In Law Interpretation Updated On Thu, Sep 22nd, 2022 by Saurenergy After facing rejections at the Central Electricity Regulatory Commission (CERC) and State Electricity Regulatory Commission’s (SERCs), Adani Green Energy had something to celebrate early this week when the Appellate Tribunal For Electricity (APTEL) permitted their plea for allowing carrying cost pass-through under the “Change in Law” definition of most PPAs. The Tribunal ordered CERC to […] Read more
Tata Power RE, Three Other Firms Win RUMSL’s 750 MW Hybrid Project Updated On Wed, Sep 21st, 2022 by Saurenergy A joint venture company between The Solar Energy Corporation of India (SECI) and Madhya Pradesh Urja Vikas Nigam (MPUVN), Rewa Ultra Mega Solar Limited (RUMSL) has released the results of 750 MW hybrid (wind+solar) project. Sprng Ojas, Tata Power Renewable Energy, ReNew Solar Power, and TEQ Green Power IX (O2 Power) were declared the winners […] Read more
Adani Green Commissions 325MW Wind Power Plant in Madhya Pradesh Updated On Tue, Sep 20th, 2022 by Saurenergy In Madhya Pradesh’s Dhar area, Adani Green Energy Limited commissioned a 325MW wind energy power plant. With this, Adani Green Energy Limited’s (AGEL) operational generation capacity has increased to 6.1 gigawatts. 324.4MW (325MW) wind power plant in Dhar, Madhya Pradesh, had been inaugurated by Adani Wind Energy MP One Private Ltd (AWEMP1PL), a division of […] Read more
Part Commissioning of ISTS Solar Projects Gets Green Signal from MNRE Updated On Thu, Sep 15th, 2022 by Saurenergy Solar projects connected to interstate transmission (ISTS) in lots of 10 MW or more have recently received approval from the Ministry of New and Renewable Energy (MNRE) for partial commissioning. The choice was made to speed up the commissioning of solar power projects and to follow the lead of such assistance already given to wind […] Read more