Indore Takes A Leaf From Gujarat Sludge Treatment Plant, To Turn Solar Updated On Wed, Jul 6th, 2022 by Saurenergy Indore Smart City Development Limited is going to set up a second solar-run sludge hygienization plant in Kabitkhedi area of Indore. The first state to do so was Ahmedabad. The dedicated solar power plant is expected to reduce power consumption by up to 50 per cent. Second city in the country after Pirana in Gujarat, […] Read more
Trina Solar Added One More PV Factory for Stronger N-Type Cells Updated On Tue, Jul 5th, 2022 by Saurenergy Trina Solar New Energy Industrial Park project’s commencement ceremony was held in Xining. This New Energy Industrial Park project will effectively cover every stage of PV modules production, from polysilicon fabrication to modules made with 210 and N-type technology. 10 GW N-type modules are on the way, for higher customer value Trina claims that the […] Read more
BHEL Issues Tender for Supply of 1 Crore MONO PERC Solar Cells Updated On Tue, Jul 5th, 2022 by Saurenergy Bharat Heavy Electricals Limited (BHEL) has invited bids for a 1.027 crore MONO PERC solar cells supply. Tender is also including packing & transportation to as per incoterms, satisfactory completion of Supply of these cells. According to the tender, the output wattage of each PV cell should be 5.38Wp & has five busbars. Each cell […] Read more
Application of Silicone Sealant in Solar Modules Updated On Tue, Jul 5th, 2022 by Saurenergy Introduction Solar module manufacturing appears to be quite simple, yet the performance and life cycle of the module depends on every individual part, whose effective coordination is expected to extend the durable life of solar module to 25 years or longer. Today, we look at solar sealant, perhaps the least noticed, but a critical and […] Read more
First Batch Of Hero Electric E-Scooters Rolls Out From Mahindra Stable At Pithampur, Madhya Pradesh Updated On Tue, Jul 5th, 2022 by Saurenergy Automobile major Hero Electric made an announcement on July 4 that its strategic partnership with Mahindra group has finally taken the shape of e-scooters. The first batch will be rolled out from the stable of Mahindra Group in Pithampur in Madhya Pradesh. Both the companies had entered into a five-year partnership to cater to the […] Read more
Ciel & Terre India Stepped Up For 73.4 MWp Kayumkulam Floating Solar Updated On Mon, Jul 4th, 2022 by Saurenergy Ciel & Terre India, the subsidiary of French floating solar pioneer Ciel & Terre International, has executed the installation and completion of a 73.4 MWp floating solar plant at National Thermal Power Corporation, Kayamkulam, Kerala. For the firm, the project was a significant milestone, as it delivered it’s made in India floats in record time […] Read more
Soren May Unveil New Jharkhand Solar Policy On July 5 Updated On Mon, Jul 4th, 2022 by Saurenergy An ambitious new solar policy is going to be unveiled by Jharkhand Chief Minister Hemant Soren on July 5 to increase clean energy capacity from 45 MW to 4,000 megawatts in the next five years and attract the investors. The Jharkhand Solar Policy, 2022 will encourage residential rooftop solar panels in cities besides a better […] Read more
Irish Study Says Rooftop Solar Panels Can Produce 1/4 th Of Total Electricity Needed Updated On Fri, Jul 1st, 2022 by Saurenergy A quarter of total electricity needed by Irish households can be produced by installing solar panels on the domestic rooftops. Conducted by the climate scientists at University College Cork, Ireland, this was the conclusion of the study after the team had thoroughly examined every rooftop in the country using satellite imagery and weather data for […] Read more
RUMSL Issues LOAs For 600 MW Omkareshwar Floating Solar Project Updated On Fri, Jul 1st, 2022 by Saurenergy Letters of Award were distributed by Principal Secretary of New and Renewable Energy Department, Madhya Pradesh, Sanjay Dubey, on June 30 to the developers selected in the first phase of 600 MW Omkareshwar Floating Solar Project on Narmada river in Khandwa district of Madhya Pradesh. The tender for Phase-I achieved minimum rates of Rs 3.22, […] Read more