Log9 Materials Gets BIS Certification For Its LTO Batteries Updated On Tue, Apr 2nd, 2024 by Saurenergy Log9 Materials, an Indian company specializing in advanced battery solutions, announced today that its LTO (Lithium Titanate Oxide) batteries have received certification from the Bureau of Indian Standards (BIS). These Log9’s BIS-certified LTO batteries boast enhanced safety due to their inherent thermal and chemical stability, minimizing the risk of fire or explosion compared to conventional lithium-ion […] Read more
Gensol Subsidiary–Scorpius Trackers Achieves 1 GW+ Contracted Orders Updated On Tue, Apr 2nd, 2024 by Saurenergy Read more
IndiGrid Operationalises First Transmission project Updated On Tue, Apr 2nd, 2024 by Saurenergy KKR backed IndiGrid, India’s first and largest listed power sector infrastructure investment trust (InvIT), has announced the successful operationalisation of its first greenfield project – Kallam Transmission Limited (KTL) – at Beed, Maharashtra. The project was won by IndiGrid in December 2021 through the Tariff Based Competitive Bidding (TBCB) mechanism and has been developed on […] Read more
COVER STORY: India Gears Up For Solar Waste Recycling Challenge Updated On Mon, Apr 1st, 2024 by Saurenergy Read more
TPREL Delivers 200 MW Solar Project In Bikaner To Power Trading Arm Updated On Mon, Apr 1st, 2024 by Saurenergy TP Saurya Limited (TPSL), a subsidiary of Tata Power Renewable Energy Limited, has confirmed the successful commissioning of a 200MW solar project located in Bikaner, Rajasthan, for Tata Power Trading Company Limited (TPTCL). The 25 year PPA for the project had been signed in May 2023, with a targeted delivery date of March 2024. Expected […] Read more
Top Weekly Stories on Renewable Energy From 25 to 31 march 2024 Updated On Mon, Apr 1st, 2024 by Saurenergy Read more
Luminous Moves Forward On Solar Panel Mfg. With 250 MW Panel Plant Updated On Thu, Mar 28th, 2024 by Saurenergy Read more
Bihar Seeks Bids For 564 MW Solar Projects Under PM KUSUM Updated On Thu, Mar 28th, 2024 by Saurenergy Component C of the PMKUSUM scheme, which seeks grid connected solar pumps as part of the same (Component B is off grid pumps and Component A is ground mounted solar ), is in the limelight in Bihar. Bihar State Power Generation Company (BSPGCL) has invited bids for 564 MW of projects under the scheme, in […] Read more