Wind Energy: MNRE Amends RLMM Norms To Boost Local Business Updated On Mon, Apr 21st, 2025 by Saurenergy India’s Ministry of New and Renewable Energy (MNRE) has proposed revisions to the Revised List of Models and Manufacturers (RLMM) for the wind energy industry, with a focus on boosting domestic manufacturing and strengthening data privacy. MNRE’s RLMM enlists Indian and global wind turbine manufacturers, operational in the Indian wind energy market. In its latest […] Read more
Suzlon Secures A 100.8 MW Wind Order from Sunsure Energy Updated On Thu, Apr 17th, 2025 by Saurenergy Read more
Suzlon Secures A 100.8 MW Wind Order from Sunsure Energy Updated On Thu, Apr 17th, 2025 by Saurenergy Suzlon Energy today announced securing a 100.8 MW EPC wind power order from Sunsure Energy, marking their maiden foray into wind energy. The project is set to be executed in Maharashtra’s Jath region. Under this agreement, Suzlon will supply 48 state-of-the-art S120 wind turbine generators (WTGs) with Hybrid Lattice Towers (HLT), each rated at a […] Read more
MNRE Allows Prototype Wind Turbines 3 Yrs For Testing Updated On Mon, Apr 14th, 2025 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued new draft guidelines stating that prototype wind turbines will be allowed a maximum of three years to obtain type certification for new technologies. These guidelines are part of MNRE’s latest framework for installing prototype wind turbine models. According to the proposal, the installation of a […] Read more
As Wind Energy Finally Crosses 50 GW Milestone, No Time To Rest Updated On Fri, Apr 11th, 2025 by Saurenergy Read more
As Wind Energy Finally Crosses 50 GW Milestone, No Time To Rest Updated On Fri, Apr 11th, 2025 by Saurenergy The March update from India’s Central Electricity Authority finally confirmed what was expected. The breaching of the 50 GW milestone by India’s wind energy developers. With Fy25 seeing fresh additions of 4.15 GW, the industry saw one of its best years, even though the all time best seen in 2016-17 still seems a tough target […] Read more
NTPC Commissions 90 MW Wind Project in Gujarat Updated On Wed, Apr 9th, 2025 by Saurenergy NTPC Renewable Energy Ltd (NTPC REL), has commissioned the second phase of its Dayapar Wind Energy Project in Bhuj, Gujarat, the company said in a regulatory filing. The NTPC REL, a subsidiary of NTPC Green Energy Ltd and a step-down unit of NTPC Ltd, further added, “NTPC has completed 90 MW capacity wind project which […] Read more
Senvion India Launches 3.1M130 Wind Turbine With RLMM Entry Updated On Fri, Apr 4th, 2025 by Saurenergy Senvion India’s 3.1M130 wind turbine has been included in the Ministry of New and Renewable Energy’s (MNRE) Revised List of Models and Manufacturers (RLMM) issued in April 2025, the company said. It plans to begin grid-connected commercial installations across the country soon. The Indian firm, owned by Saudi based Alfanar group hopes to wrest a […] Read more
Avaada Slips Up As CERC Upholds Cancellation Of Connectivity in MP Wind Projects Updated On Thu, Apr 3rd, 2025 by Saurenergy The Central Electricity Regulatory Commission (CERC), in an order dated March 30 involving Avaada Energy and Central Transmission utility (CTUIL), passed an order that censures both the parties involved. For Avaada, the blow is heavier because the CERC eventually upheld the decision of the CTUIL to cancel the connectivity license accorded to Avaada for its […] Read more