Service Technology Lead – Control Hardware Updated On Fri, May 2nd, 2025 by Saurenergy Responsibilities:- Guide module development with design choices that align with the overall Service Strategy and “Design for Service” principles. Ensure Service considerations are integrated into Design Reviews, shaping service-related technology and design choices Act as the Service representative in Module and Sub-Module Peer Reviews as well as Technical Reviews Lead and encourage stakeholders to attain […] Read more
Bid Management Process Improvement Lead Updated On Thu, May 1st, 2025 by Saurenergy A Bid Management Perfection Process Improvement Lead plays a crucial role in improving the bid management process and taking them to the next level, enhancing speed, accuracy and quality. This role aims to optimize the efficiency and effectiveness of the organization’s bidding efforts, ensuring a competitive position in the marketplace. This role has close interaction […] Read more
Suzlon Wins 378 MW Order From NGEL, Pact Grows To 1.544 GW Updated On Wed, Apr 23rd, 2025 by Saurenergy Suzlon Group has secured a 378 MW wind project order from NTPC Green Energy Ltd (NGEL), expanding its total partnership capacity with the public sector utility to 1,544 MW. The win comes even as a key Industry body has predicted additions of 6-7 GW in wind capacity in Fy 26 for India. This marks Suzlon’s […] Read more
Senior Engineer-Testing and Analysis Updated On Mon, Apr 21st, 2025 by Saurenergy In this role, you will be directly reporting to Team Lead- Measurements. Measurement team is actively involved in validation of simulation models through activities that include Measurement equipment installations / operations / maintenance / data study, interpretation and reporting (for power performance, fault ride through measurements, power quality measurements and load measurements on a wind […] Read more
Bigger & Faster – South India’s Renewable Comeback Updated On Wed, Apr 16th, 2025 by Saurenergy South India, which heralded some of the earliest large-scale solar and wind projects in the country, is now further expanding its clean energy footprint. Again, one could say that some of India’s most notable renewable achievements came from the region before 2020. From the then-largest solar plant at Kamuthi in Tamil Nadu with a 648 […] Read more
Engineer / Senior Engineer / ALE – Condition Monitoring Updated On Mon, Apr 14th, 2025 by Saurenergy Global Predictive Monitoring team is part of Global Service Operations, Quality & HSE in Service, mainly focusing on monitoring activities such as analysis on vibration data and standard signals to measure performance and determine condition of the wind turbines and components, combining and developing methods to detect and highlight potential failures and damages before they […] Read more
Grid Engineer Updated On Wed, Apr 9th, 2025 by Saurenergy Develop and optimize electrical simulation models using simulation tools such as DigSilent Power Factory or PSCAD. Conduct various simulation studies with a focus on Transient stability studies and harmonic studies. Parametrize Wind Turbine simulation models and maintain Wind Turbine parameter database (Added advantage). Benchmark and validate developed simulation models to ensure accuracy and reliability. Implement […] Read more
Senior Commercial Sales Manager Updated On Wed, Apr 9th, 2025 by Saurenergy Manages controlling & reporting and commercial tasks in Sales areas to directly support effective and profitable Business and supports accountable management in assigned area of responsibility. A passion for renewable energy and a sense for the importance to lead the change. We are also looking for… Guides ongoing comparison of objectives and their achievement, drives […] Read more
KPI Green Terminates 66.2 MW Hybrid Order With Sai Bandhan Infinium Updated On Tue, Apr 8th, 2025 by Saurenergy KPI Green Energy has terminated a 66.2 MW hybrid power project order received from Gujarat-based Sai Bandhan Infinium, which is preparing for an initial public offering (IPO). The order, awarded in 2024, was scrapped six months later due to changes in technical requirements, the company said in a regulatory filing. “The project, part of the […] Read more