Tender, Tariff, and Takers: 2024 A Brief Review Updated On Mon, Jan 6th, 2025 by Saurenergy The renewable energy landscape is witnessing a transformative shift, with bidding processes increasingly favoring innovative solutions like Round the Clock (RTC) energy, Firm and Dispatchable Energy (FDRE), and wind-solar hybrid (WSH) tenders. Notably, energy storage has emerged as a game-changer, becoming an integral component of many new tenders. According to an SBI Caps report, storage […] Read more
FY25: Karnataka Witnesses A Fall In New RE Capacity Additions Updated On Mon, Dec 30th, 2024 by Saurenergy Karnataka Renewable Energy Development Ltd (KREDL) shared recent data on the annual renewable capacity addition in the state. The data found a decline in annual renewable energy projects in the state in the past years. The government data on year-wise commissioned projects indicated a significant drop in installed capacity in Karnataka in FY25. As of […] Read more
ACME’s Subsidiary Secures Rs. 1,988 Cr Financing From PFC Updated On Thu, Dec 26th, 2024 by Saurenergy ACME Renewtech Private Limited, a subsidiary of Haryana-based ACME Solar Holdings (ACME Solar) recently secured Rs. 1,988 crore term loan financing from Power Finance Corporation (PFC). This financing will fund the development and construction of a 300 MW Solar-Wind Hybrid Renewable Energy Project. The project will be located in high-resource potential areas, with solar capacity […] Read more
The 10 Big Milestones That Will Define India’s RE Sector In 2025 Updated On Thu, Dec 26th, 2024 by Saurenergy The Indian renewable energy market witnessed several historic events in 2024. These include policy changes, diversified and copious tenders, a record pace of green project installations, bulging order books across manufacturers, EPCs and more. While the overarching focus of the year was to be self-reliant in manufacturing, with real progress finally visible, China still cast […] Read more
Lender’s Engineer – Renewables Updated On Thu, Dec 19th, 2024 by Saurenergy Capable of handling the project related to solar, wind, battery energy storage system (BESS) as a project manager and will be responsible for all the internal and external communication related to the Project. Overview and In-depth knowledge of wind, solar and BESS projects. Capable of handling Owners Engineering (Review of Design Documents), Detailed engineering design […] Read more
Sembcorp Enters BESS Market In India, RE Capacity Touches 6 GW Updated On Wed, Dec 18th, 2024 by Saurenergy Sembcorp Industries (Sembcorp) today announced receiving a Letter of Award (LoA) for a 150 MW solar photovoltaic project coupled with a Battery Energy Storage System (BESS) of 300MWh. The Singapore-based company secured this award from the Solar Energy Corporation of India Ltd (SECI) through its subsidiary Sembcorp Green Infra Private Limited (SGIPL). The Build-Own-Operate (BOO) […] Read more
Deputy General Manager Updated On Thu, Dec 5th, 2024 by Saurenergy Responsibilities:- System Design & Engineering:- Review load profiles and engineer Battery Energy Storage Systems (BESS) to meet project goals. Design, select, and size battery systems, optimizing parameters for performance. Utilize simulation tools (e.g., MATLAB, Homer) for battery system sizing and performance modeling. Technical Expertise:- Deep understanding of BESS design, battery chemistry, performance modeling, and lifetime […] Read more
RE Supply Shift Poised To Favor North And South India Over West By 2032: SBI Caps Report Updated On Fri, Nov 29th, 2024 by Saurenergy India added 30 GW to its installed base (net basis) in the past 12 months, of which 75% was renewables, according to the latest data released in the SBI Caps report. Renewable energy has made notable progress recently, driven by fresh wind additions and a surge in energy storage system (ESS) tenders, as noted in […] Read more
Avaada Signs MoU To Develop 1200 MW of PSP In Rajasthan Updated On Fri, Nov 22nd, 2024 by Saurenergy Indian renewable energy conglomerate Avaada Group has entered into a Memorandum of Understanding (MoU) with the Rajasthan government to develop a 1200 MW Pumped Storage Project. The MoU, formalized between the Energy Department of the Rajasthan government and Avaada Aqua Batteries Pvt. Ltd., a subsidiary of Avaada Group marks the next chapter in Avaada’s investment […] Read more