Even Better Together- Five Ways Solar Is Better With Other Green Energy Options Updated On Thu, Jul 4th, 2024 by Saurenergy Solar power is the fastest-growing energy source globally. The Global Market Outlook for Solar Power 2024-2028 report reveals that in 2023, global solar installations surged by 87 per cent compared to the previous year. In 2023, 447 GW of new solar capacity was added, up from 239 GW in 2022, bringing the world’s total solar […] Read more
Solar Buyers Should Be Reassured With These Test Results Updated On Tue, Jun 11th, 2024 by Saurenergy In a world with planned obsolescence and firms going belly-up without warning, it’s reasonable to be a little cautious when it comes to buying technology. Solar is no exception to this rule, with naysayers of the technology pointing to solar panel degradation rates, claiming that the technology won’t be efficient enough to justify the cost […] Read more
Five Solar Startups Using AI To Make An Impact Updated On Tue, May 21st, 2024 by Saurenergy If tech in the 2020s had to be defined by a phrase, it’d be Artificial Intelligence or AI. With every product nowadays coming out with some form of AI, it’s not surprising to see AI make its way to solar as well. In particular, startups have been at the forefront of the AI revolution for […] Read more
NTPC-REL Seeks Bids For 225MW Solar Project At GSECL Solar Park At Khavda Updated On Mon, May 20th, 2024 by Saurenergy NTPC Renewable Energy Limited (REL) has invited bids for the development of a 225MW grid-connected solar PV project at Gujarat State Electricity Corporation Limited (GSECL) solar park (Stage-III), at Khavda. NTPC-REL invited online bids from eligible bidders on a single-stage two-envelope (i.e. Envelope-I: Techno-Commercial Bid and Envelope-II: Price Bid) basis. The tender includes the supply […] Read more
What Is BIPV That Generates Solar Power Without Solar Panels? Updated On Mon, Jan 22nd, 2024 by Saurenergy Building-integrated photovoltaics, also known as BIPV, is the required material that takes the panel off the roof and, puts it inside the roof itself. According to Office of Energy Efficiency and Renewable Energy (EERE), an office of the US Department of Energy, BIPV is a set of emerging solar energy applications that replace usual building […] Read more
PV Solar Panel Manufacturer Alpex Solar Limited files DRHP, To Be Listed With NSE Emerge Updated On Tue, Dec 5th, 2023 by Saurenergy Greater Noida- based Alpex Solar Limited, has announced the filing of its Draft Red Herring Prospectus (DRHP) with NSE Emerge. The offering comprises a fresh issuance of 64,80,000 equity shares with a face value of Rs. 10 for each share. Alpex Solar clocked a revenue of Rs. 183.93 crore in FY23, up from Rs. 156.06 […] Read more
Berkeley, DOE Produce Database To Map Solar PV Facilities Updated On Tue, Nov 14th, 2023 by Saurenergy Berkeley Lab and USGS (U.S. Geological Survey) in collaboration with the U.S. Department of Energy’s (DOE) produced a publicly available database. The detailed Large-Scale Solar Photovoltaic Database (USPVDB) aims to map ground-mounted photovoltaic (PV) facilities with capacity of 1 megawatt. This come alongside US’s DOE (Department of Energy) data, that released an online dataset of […] Read more
1 Terawatt and Beyond: Solar Energy’s Unstoppable Rise and What Lies Ahead Updated On Mon, Jul 10th, 2023 by Saurenergy Solar has come a long way in the last few years, from over 100,000 megawatts in 2012 to one terawatt now (1 terawatt is 1 million megawatts). So, what spurred this development? What were the factors that facilitated the achievement of this feat? We’ll be going over humanity’s journey to 1 TW of installed capacity […] Read more
MNRE Extends Deadline For Solar Park Scheme Upto 2025-26 Updated On Wed, Jun 21st, 2023 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has now issued an official notification, ordering an extension in the deadline for developing solar parks under the Solar Park Scheme and ultra mega solar power projects in the country. The new order from the ministry said that the deadline had been extended till March 31, 2026, without […] Read more