Airtouch In Key Deal With ReNew For Its Panel Cleaning Equipment Updated On Mon, Aug 7th, 2023 by Saurenergy Israel based robotic cleaning solutions firm Airtouch Solar continues to make inroads into the Indian market. In it’s latest deal announcement, the firm has announced the closure of its fifth and largest agreement with ReNew worth $8.5 million for supply of Airtouch’s advanced robot model – Airtouch AT 4.0 for ReNews solar projects in India. […] Read more
1 TW Renewable Potential in Egypt: A Game-Changer or a Distant Dream? Updated On Fri, Aug 4th, 2023 by Saurenergy Egypt has the potential to produce electricity capacity of 350 gigawatts (GW) from wind energy and 650 GW from solar energy, the Minister of Electricity and Renewable Energy Mohamed Shaker suggested at the fourth edition of the round table on the green hydrogen industry in Egypt, chaired by Egypt’s Prime Minister Mostafa Madbouly. The claim […] Read more
A Case For Green Financing For More Transmission Infrastructure Updated On Fri, Aug 4th, 2023 by Saurenergy In a provocative blog on the importance of the transmission sector and its role in the energy transition, two world bank staffers make the case for expanding the definition of green projects when it comes to transmission projects, to ensure faster adaption of these vital infrastructure to handle green energy projects. The article comes at […] Read more
Sikkim, Himachal, Chandigarh Top Performers In RPO Compliances Updated On Tue, Aug 1st, 2023 by Saurenergy A latest data from the Ministry of Power claimed that Sikkim, Himachal Pradesh, Chandigarh and Uttarakhand emerged as the best performing states in terms of their compliances towards Renewable Purchase Obligations (RPOs). The data was shared today by Union Minister of Power RK Singh today before the Lok Sabha. According to the data shared by […] Read more
Senior / Lead Engineer – Battery Energy Storage System Updated On Tue, Jul 25th, 2023 by Saurenergy Responsibilities:- Review load profiles and Engineer Battery Energy Storage Systems to meet project goals. Clear understanding on the different parameters for design, selection, and sizing of the batteries as well leveraging the parameters to arrive at the most optimum sizes of the batteries. Should have deep understanding on Battery Energy Storage System design, chemistry selection, […] Read more
Using the Piecewise Method to Check the PV String Ground Point Updated On Thu, Jul 20th, 2023 by Saurenergy Background As the running time of PV plants increases, the DC line slowly ages, and the waterproof performance of the DC terminal (MC4 terminal) deteriorates. As a result, the insulation impedance of the DC line is too low, or the positive and negative terminals are short circuited to the ground. Either way, major failures may […] Read more
Sterlite Power Commissions its Sixth Power Transmission Project in Brazil Updated On Thu, Jul 20th, 2023 by Saurenergy Sterlite Power, a power transmission developer and solutions provider, has commissioned a transmission project in Brazil. The Marituba Transmission Project is the sixth power transmission project commissioned successfully by the firm in Brazil. Built with an investment of INR 1,600 crore, Project Marituba involved developing a 344 km long 500kV transmission corridor connecting Brazil’s largest […] Read more
UK’s First Renewable Energy Powered Electric Airline Ecojet to be Commissioned in 2024 Updated On Wed, Jul 19th, 2023 by Saurenergy Earlier this week, British entrepreneur Dale Vince announced plans to launch an electric airline that will be powered using renewable energy, potentially marking the dawn of a new era in air travel. The formation of Ecojet represents the latest attempt to reduce the environmental footprint of aviation. Flights in the UK will begin in 2024. […] Read more
SECI Issues Tender for Soil Investigation for 13 GW Renewable Energy Project Sites in Leh Updated On Wed, Jul 19th, 2023 by Saurenergy Solar Energy Corporation of India (SECI) has issued a tender for the appointment of an agency to conduct soil investigation at proposed renewable energy project sites in Leh, Ladakh, with a cumulative capacity of 13 GW. The geotechnical analysis for the project must be completed within eight months of signing the contract. The last date […] Read more