NERD to conduct three-month training programme on “solar PV installer and service provider” Updated On Thu, Mar 3rd, 2016 by Saurenergy A training program on ‘Solar PV Installer and Service provider’ supported by central and state governments would be organised in Coimbatore to create more professionals in the field of solar energy. Training will include sessions on soft skills and entrepreneurship The program is sponsored by the National Institute of Solar Energy, the Ministry of New […] Read more
Global Solar PV Pipeline well Crosses the 200 GW Mark Updated On Tue, Feb 23rd, 2016 by Saurenergy With an undeniable stir in United States solar investment tax credit (ITC) proposed last year, the global solar photovoltaic pipeline is now reported to surpass 200 gigawatts (GW). At a combined capacity of 110 GW, projects in the U.S., China and Brazil make up half of the current PV pipeline, according to IHS. The biggest […] Read more
Intended Capital Cost for Solar PV – Central Electricity Regulatory Commission (CERC) Updated On Thu, Jan 7th, 2016 by Saurenergy Central Electricity Regulatory Commission (CERC) passed an instruction for resolution of standard capital expense for solar PV ventures for the fiscal year 2016-17. The instruction gauges capital expense including expense of gear, development, land, transmission and pre-operative costs of solar PV ventures for the upcoming FY at INR 50.1 million/MW (USD 0.76 million). Giving a […] Read more
Hooper Solar PV power Plant in Colorado Updated On Thu, Dec 24th, 2015 by Saurenergy The Xcel Energy and the SunPower Corp. announced the commercial operational of the 50MW Hooper Solar PV power plant in Colorado’s San Luis Valley. The Xcel Energy is acquiring the force produced by the plant at cost-aggressive rates under a power buy concurrence with SunPower Corp. The utility gauges that the plant is creating enough […] Read more
Cabinet to install 15,000Mw Grid Connected Solar PV Power with NTPC Updated On Wed, Dec 16th, 2015 by Saurenergy The Cabinet in a row to revive the National Solar Plan accredited the scheme of installing 15,000Mw Grid connected Solar PV Power through NTPC across three tranches. The Three Tranches will be: 3000 MW under Tranche-l under component of Packaging with Unallocated Coal based Warm Power and settled levies 5,000 MW under Tranche-ll with some […] Read more
Bluebird Solar Launches N-Type TOPCon Dual Glass PV Module Updated On Mon, Apr 29th, 2024 by Saurenergy Greater Noida-based PV Module manufacturer Bluebird Solar has launched its N-Type TOPCon PV Modules at RenewX, Hyderabad by exhibiting 600W N-TOPCon dual glass Bi-Facial PV Module. The modules have a light conversion efficiency of 23.25% and bifaciality factor of 70 +/- 5% the Bluebird 600Wp TOPCon Solar PV Module. According to Bluebird Solar, 600Wp TOPCon […] Read more
Indosol Solar Commences PV Module Production In Andhra Pradesh Updated On Fri, Apr 5th, 2024 by Saurenergy Indosol Solar Private Limited, a subsidiary of Shirdi Sai Electricals Limited (SSEL) has commenced production from its solar PV module manufacturing facility in Ramayapatnam, Nellore, Andhra Pradesh to commission the 500MW modules line at the project. According to Indosol Solar, in the commissioning stage, the facility is equipped to manufacture 500 MW of fully automated, […] Read more
SOFAR Brings PV & ESS Solutions At Solar Solutions 2024 Updated On Thu, Mar 21st, 2024 by Saurenergy Photovoltaic and Energy Storage System solutions company SOFAR presented its various products during the Solar Solution conclave 2024. SOFAR PowerMagic, a system crafted for C&I ESS, made a debut at the expo. It’s endowed with an efficient liquid cooling system and intelligent temperature control, promising unsurpassed cooling capabilities and energy efficiency. The modular design allows […] Read more