System Design and Study Engineer Updated On Wed, Feb 19th, 2025 by Saurenergy Engineering authority in design studies and performance evaluation studies for projects/tenders for Flexible A.C. Transmission Systems (FACTS) technology aligned with Power Quality Solutions (PQS) Business. Roles and responsibilities: Define topology and single line diagram for FACTS solution based on customer requirement. Specify main circuit components such as Power Transformer, Power Electronics Valves, Reactors, Capacitors, CT, VT, Breaker etc. based […] Read more
Trina Tracker Opens 3 GW Solar Manufacturing Factory In Saudi Arabia Updated On Wed, Feb 19th, 2025 by Saurenergy TrinaTracker, a smart solar tracking solutions provider and a Trinasolar subsidiary has established a new manufacturing facility in Saudi Arabia. The facility is set to begin operations in Q1 2025. Trina Tracker for Renewable Energy, helps the company enhance its localization and its distribution and service capabilities in the MEA region. The factory is part […] Read more
SaurEnergy Explains: Balcony Solar – A Game Changer for Apartment Dwellers? Updated On Wed, Feb 19th, 2025 by Saurenergy Solar power has taken over the world’s new power projects, becoming the harbinger of the renewable energy age that everyone awaited for so long. Indeed, the utility scale mega solar projects and rooftop solar have been the mainstream type of solar installations. However, other solar power systems, like the balcony solar systems, are quietly gaining […] Read more
MoP Advises REIAs To Co-Locate ESS With Solar Plants In Upcoming Tenders Updated On Wed, Feb 19th, 2025 by Saurenergy The Ministry of Power (MoP) has released an advisory on the co-location of energy storage systems (ESS) with solar plants. Its latest advisory aims to incorporate a minimum of a 2-hour co-located Energy Storage System (ESS) equivalent to 10% of installed solar capacity in future tenders. The notification stated, “This requirement will help mitigate intermittency […] Read more
“WAACAB Focused On Large Solar Installations”-Satyam Khamar Updated On Tue, Feb 18th, 2025 by Saurenergy India’s solar boom has opened up a world of opportunities for many firms. WAA Cables is one which has grabbed the opportunity opened up by the rising demand for specialised cables and more for the growing solar footprint across the country. Along with that has come the EV rush, now picking pace, where the firm […] Read more
PM KUSUM-C: Madhya Pradesh issues Tender for 1.5 GW Solar PV Updated On Tue, Feb 18th, 2025 by Saurenergy Madhya Pradesh Urja Vikas Nigam Limited (MPUVN) has invited bids to select Renewable Power Generators (RPGs) for developing 1.5 GW of grid-connected solar PV systems. The energy generated from these projects will be sold to MPPMCL under the feeder solarization component of PM-KUSUM-C at various locations in Madhya Pradesh. The deadline for online bid submission […] Read more
Waiver of ISTS Charges-Will Power Ministry Oblige RE Developers? Updated On Mon, Feb 17th, 2025 by Saurenergy Inter State Transmission Charges or ISTS charges are a key component of power bills across India. Thus, their waiver for renewable energy producers has been a major support on which the energy has grown, by helping keep costs lower than they would otherwise have been. Of course, most states have sought to extract their own […] Read more
Manipur: NHPC Issues Rooftop Solar Tender For 13 Govt Buildings Updated On Mon, Feb 17th, 2025 by Saurenergy NHPC’s renewable energy arm, NHPC Renewable Energy (REL), recently issued a tender to select developers for grid-connected rooftop solar plants at various government buildings in Manipur. These projects will be developed under the RESCO mode, with a bid submission deadline of March 17, 2025. NHPC REL manipur rooftop solar tender stated, “The bidder is expected […] Read more
Sineng Electric Powered 661 MW Project Goes Live In AP Updated On Fri, Feb 14th, 2025 by Saurenergy Sineng Electric, a solar and energy storage solutions providing company, has commissioned a 661MW (925MWp) solar project in Kurnool, Andhra Pradesh. Powered by Sineng’s solar energy solutions, the project has commenced commercial operations. It’s part of the 975MW hybrid renewable energy system developed by ArcelorMittal Nippon Steel India, which includes 661MW (925MWp) of solar power […] Read more