Principal Electrical Engineer – Primary Updated On Fri, Sep 27th, 2024 by Saurenergy Responsibilities:- Ability to lead the Primary Design (Concept, FEED , Detail Design) for AIS/GIS/Hybrid Substations upto 400kV – for Utility Companies /Developers, based on international standards – for, UK, Europe, Middle East , South East Asia or Australia regions. Experience in Design of HV/LV Distribution systems for Oil & Gas Sector , offshore Substation, Thermal […] Read more
Engineer – Primary Updated On Tue, Sep 24th, 2024 by Saurenergy This role is responsible to execute & analyse, design, test, or support integration required to define and support systems that meet business standards and program / product requirements. General responsibilities:- Responsible for Solar /BESS design at OTR & ITO Project. Align with Lead Engineer / Internal Stake holder to define the capacity of the Plant, […] Read more
Delectrik Wins 3 MWh Battery Energy Storage Project From NTPC Updated On Tue, Sep 24th, 2024 by Saurenergy Gurugram-based Delectrik Systems, a flow battery OEM, won a tender from NTPC for its NETRA division (NTPC Energy Technology Research Alliance) to deploy a 3 MWh Vanadium Redox Flow Battery (VRFB) based Battery Energy Storage System (BESS). NETRA is deploying this VRFB as long-duration energy storage (LDES) to augment the storage capacity of its microgrid […] Read more
Kerala Plans To Use BESS At Trivandrum Hospital On Pilot Basis Updated On Mon, Sep 23rd, 2024 by Saurenergy The Kerala government has decided to use solar power and battery energy storage systems in a pilot project. As per the plan, the Agency for New and Renewable Energy Research & Technology (ANERT) will execute the project in a Trivandrum Hospital. This pilot project will be executed under the Smart City Programme for Thiruvananthapuram. The […] Read more
CEA Approves 2.5 GW Of PSP Projects In Maharashtra Updated On Mon, Sep 23rd, 2024 by Saurenergy The Central Electricity Authority (CEA) has announced concurring two more Pumped Storage Projects (PSPs) in Maharashtra namely-1500 MW Bhavali PSP being developed by JSW Energy Ltd. and 1000 MW Bhivpuri PSP being developed by Tata Power Co. Ltd. These PSPs are concurred with the support of the Central Water Commission (CWC), Geological Survey of India […] Read more
Cygni, HiNa To Bring India-Specific Sodium-ion Energy Solutions Updated On Tue, Sep 17th, 2024 by Saurenergy Cygni Energy Private Limited, a Hyderabad-based energy storage solutions player has planned to collaborate with HiNa to develop India-specific Sodium-ion based storage solutions. This storage solution is cheaper, safer, and allows 20-minute charging. Cygni Energy has been an advocate of Sodium-ion-based solutions and a challenger to Lithium for specific applications. As part of this partnership, […] Read more
Manager Renewable Engineering (Control & Instrumentation Engineer) Updated On Tue, Sep 17th, 2024 by Saurenergy We are seeking a leading role in the Renewable Engineering Control & Instrumentation (C&I) division for our Renewable Energy (RE) Power Plants which will be a mix of Solar, Wind, and BESS systems. This position is responsible for C&I engineering which includes major development of control architecture of complete solar + wind + BESS Hybrid […] Read more
SECI Awards 1 GW/2 GWh BESS Project to JSW And Reliance Updated On Mon, Sep 16th, 2024 by Saurenergy SECI has announced that JSW Neo Energy and Reliance Power are the successful bidders for 1,000 MW/2,000 MWh standalone battery energy storage systems (BESS), under tariff-based global competitive bidding. Both companies were awarded an equal capacity of 500 MW/1,000 MWh. JSW Neo Energy quoted a tariff of Rs. 381,000/MW per month, and Reliance Power quoted […] Read more
SECI Issues Fresh FDRE Tender For 8 GWh (2GW x 4 hours) Updated On Fri, Sep 13th, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) has announced a Firm and Dispatchable Renewable Energy (FDRE) tender for peak supply totaling 8,000 MWh (2,000 MW x 4 hours). The project will be developed on a Build Own Operate (BOO) basis. SECI intends to sign a Power Purchase Agreement (PPA) with the successful bidders for a […] Read more