India’s RE Investment Hits USD 12.4 Bn, Falls Short of 2030 Target: Report Updated On Tue, Nov 12th, 2024 by Saurenergy India’s renewable energy investment has grown to USD 12.4 billion in 2023, up from 2020. However, investment remains far below the estimated USD 200 billion required to achieve India’s goal of 500 GW of non-fossil fuel electricity capacity by 2030. According to the Zero Carbon Analytics report’s findings, to meet the 500 GW of non-fossil […] Read more
The Emissions Impact of Repurposed EV Battery Packs in Residential Settings Updated On Tue, Nov 12th, 2024 by Saurenergy The popularity of plug-in electric vehicles (PEVs) has taken off, thanks to better batteries, lower costs, and strong policy support. However, as electric mobility becomes more mainstream, a crucial question arises, what happens to these batteries when they are no longer usable? With 1.2 million electric vehicle batteries predicted to be decommissioned worldwide by 2030 […] Read more
Civil Engineer (Power) Updated On Fri, Nov 8th, 2024 by Saurenergy This individual will be the Civil Engineer on a multi-disciplinary design team at a successful and growing company. Be part of a high-performance group focusing on emerging power plant-based reciprocating engine/Battery storage/Solar technology that’s being adopted across the U.S. and the globe. Civil Engineer will work on an integrated design team within our Power Global […] Read more
Vanilla To BESS: Share of Energy Storage Tenders Goes From 5% To 23% In 10 Ys Updated On Fri, Nov 8th, 2024 by Saurenergy From plain vanilla tenders to Firm and Dispatchable Renewable Energy (FDRE), the Indian tendering system has come a long way. Since 2020, demand for energy storage has surged. With nearly a quarter of tenders now requiring energy storage, the need for Energy Storage Systems (ESS) is gaining momentum. SBI CAPS, in its latest report on […] Read more
RRUVNL Launches Rajasthan’s First BESS Tender For 1000MWh Updated On Thu, Nov 7th, 2024 by Saurenergy To meet its expanding energy needs, Rajasthan’s state power generation company, Rajasthan Rajya Vidyut Utpadan Nigam (RRUVNL), has announced its first standalone Battery Energy Storage System (BESS) tender. This 500 MW/1000 MWh tender, which includes a greenshoe option, will be developed across six locations: Giral Lignite Power Project in Barmer; Suratgarh Thermal Power Station; RVPNL […] Read more
Senior Engineer – Program Management (NPI) Updated On Thu, Nov 7th, 2024 by Saurenergy The Senior Engineer – Program Management (NPI) position will be based in Hyderabad, India. In this position, you will report to the Senior Manager – Program Management and will be responsible for facilitating Nextracker’s Product Development. He/she ensures that Nextracker’s products and installation out-perform customer expectations, are of the highest quality possible, and develops customer […] Read more
Grid Compliance Specialist Updated On Thu, Nov 7th, 2024 by Saurenergy Systems engineering is a cross-functional engineering discipline centered on an approach, mindset, and process. All activities that consider both the business and the technical needs of the customers with the goal of providing a quality product that meets the user’s needs. The discipline that executes a robust process of design, creation, and optimization of systems, […] Read more
Noida International Airport Set To Boost Renewable Energy Usage Updated On Thu, Nov 7th, 2024 by Saurenergy Noida International Airport (NIA), today entered into a partnership with Tata Power, an integrated power company, to incorporate renewable energy into the aviation company. Under this arrangement, Tata Power Trading Company Ltd. (TPTCL) plans to supply 10.8 MW of wind power to NIA, sourced from Tata Power Renewable Energy Ltd. (TPREL). Additionally, TPREL plans to […] Read more
SECI Imposes Bar On Anil Ambani’s Reliance Power For 3 Years Updated On Thu, Nov 7th, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) has now issued an official notification to bar Anil Ambani-led Reliance Power, Reliance NU BESS, and any of its subsidiaries from participating in tenders for the next three years. This comes after investigations revealed the alleged use of forged documents to win SECI tenders by the firm. This […] Read more