Vanilla To BESS: Share of Energy Storage Tenders Goes From 5% To 23% In 10 Ys Updated On Fri, Nov 8th, 2024 by Saurenergy From plain vanilla tenders to Firm and Dispatchable Renewable Energy (FDRE), the Indian tendering system has come a long way. Since 2020, demand for energy storage has surged. With nearly a quarter of tenders now requiring energy storage, the need for Energy Storage Systems (ESS) is gaining momentum. SBI CAPS, in its latest report on […] Read more
Disincentivizing Solar, Battery Sectors In US Can Cost Billions: Report Updated On Thu, Nov 7th, 2024 by Saurenergy A special report from Net Zero Industrial Policy Lab said that the elevation of Donald Trump as the new President of the United States (US) may affect the solar and battery manufacturing sectors. The report said that disincentivising US solar and battery manufacturing could cost billions and open new supply chain markets for the competitors. […] Read more
Solar Manufacturing Cuts Silicon Use By 88%, Makes Solar Affordable: Report Updated On Wed, Nov 6th, 2024 by Saurenergy Globally, solar energy has soared, from 1.22 GW in 2000 to 1,418.97 GW in 2023, with solar manufacturing projected to exceed demand, making solar more affordable. Solar jobs have followed suit, which have surged to 7.1 million, and global capacity is also expected to see gains, reaching 7,203 GW by 2030. The International Solar Alliance […] Read more
Asset Management O&M (Solar) Updated On Wed, Nov 6th, 2024 by Saurenergy Responsibilities:- Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up,testing, […] Read more
Apollo Green Energy Plans To Go Public In 2025, Targets Rs 10,000cr Portfolio Updated On Tue, Nov 5th, 2024 by Saurenergy Apollo Green Energy Limited (AGEL), part of Apollo International Group, is set to build a ₹10,000 crore project portfolio by 2025. Currently, the company manages an order book of ₹3,500 crore, with ₹2,500 crore of ongoing solar projects across various states in India. As part of its growth plan, AGEL is also preparing for a […] Read more
Global RE Growth Hits New Highs Amid Falling Costs: IEA Report Updated On Tue, Nov 5th, 2024 by Saurenergy Globally, renewable energy shows no signs of slowing down. In the first half of 2024, solar PV additions rose by 36%, electric vehicle sales increased by 25%, and wind power capacity additions kept pace with last year’s deployment, said report. International Energy Agency (IEA) recent report on Clean Energy Market Monitoring indicated that clean energy […] Read more
Jinko Solar Supplies 280 GW Of Solar Modules Globally Till Q3 Updated On Tue, Nov 5th, 2024 by Saurenergy Global solar module manufacturer Jinko Solar claimed it supplied a massive 280 GW of solar modules in the first three quarters of 2024. The Chinese solar behemoth said that it became the world’s largest solar module supplier with this achievement. The solar company put forth the information while discussing its Q3 earnings results. “At the […] Read more
Bridgeway Power Launches First Virtual Net Metering Solar Plant In Delhi Updated On Mon, Nov 4th, 2024 by Saurenergy Bridgeway Power, a residential and commercial solar installation company, recently installed the first Virtual Net Metering (VNM) solar plant under BRPL (BSES Rajdhani Power Limited) of 21.60kW capacity in Delhi. This project has opened new avenues for energy sharing and cost savings across multiple locations. The project uses a bi-facial panels and micro-inverter technology. VNM […] Read more
SECI Tenders For 1.2 GW RTC Renewable Energy Projects Across India Updated On Mon, Nov 4th, 2024 by Saurenergy SECI, has issued a tender to select renewable power developers to supply 1.2 GW of Round-the-Clock (RTC) power for renewable projects across India. The last date for bids submission is 16th December. With a commissioning time of 24 months, the 4 hour RTC supply will need to maintain a Demand Fulfillment Ratio (DFR) of 80% […] Read more