NTPC Trading Arm Invites EOI For RTC Green Power Updated On Fri, Sep 2nd, 2022 by Saurenergy NTPC Vidyut Vyapar Nigam Limited, a power trading subsidiary of NTPC Limited, has invited expressions of interest from renewable energy developers for round the clock (RTC) power supply for the medium to long term. The latest tender indicates the pace at which demand for green RTC power is going up, as utilities look to ensure […] Read more
Senior Design Engineer Photovoltaic – Electrical Updated On Mon, Aug 29th, 2022 by Saurenergy Tasks & Responsibilities:- Prepare in-house drawings and technical specifications for electrical works (BOM, BOQ, RFP) Design of all electrical systems for medium and large-scale PV systems (DC, AC, LV, HV, communication systems/SCADA, earthing and lightening protection) Preparation of design packages for various project phases such as conceptualization, planning, tendering and execution Preparation of power flow […] Read more
Electrical Engineer (EHV for Renewable) Updated On Mon, Aug 29th, 2022 by Saurenergy Candidate shall develop the design and electrical engineering drawings & calculations for HV, EHV system of renewable energy projects (RE Projects – Solar PV/ Wind/ Hybrid) and ensure compliance of IEC, BIS, IEEE, CEA and IS standards. Your shall perform following functions including but not limited to: Design of electrical systems for medium and large […] Read more
Design Engineer – Mechanical Updated On Fri, Aug 26th, 2022 by Saurenergy Here is a glimpse of what you will do Secured and accurate maintenance of product lifecycle data in our Engineering and management tools. Accurate design drawing creation or changes, and drafting edits. Data entry into the database, including the creation of requests and change orders per company approval and tracking process. Quality review of engineering drawings, […] Read more
Assistant Manager – Detailing Updated On Fri, Aug 26th, 2022 by Saurenergy The Assistant Manager – Detailing will be based in Hyderabad. In this position, you will report to the Senior Project Engineering Manager . The candidate would be working directly with customers located around the globe and will manage day to day issues on utility scale PV projects from the development stage to construction support. Candidate […] Read more
Oman Looks For More Wind Power Projects at Long Coastline Updated On Fri, Aug 26th, 2022 by Saurenergy The Sultanate of Oman is assessing the long coastal parts of Sadah in Dhofar Governorate and Ras Madrakah in Al Wusta Governorate for the development of wind farm projects. This is being viewed as part of the drive of Oman Government to step up the development of renewable energy to raise green energy in the […] Read more
IEEFA Study Makes Case For More Trading, Larger Power Pooling To Cut Costs Updated On Thu, Aug 25th, 2022 by Saurenergy The transition to a resilient electricity grid with increasing amounts of cheaper, variable renewable energy will require reforms to the scheduling and dispatch of power, some of which can potentially help electricity distribution companies (DISCOMS) save billions of dollars, finds a new report by the Institute for Energy Economics and Financial Analysis (IEEFA). “India added […] Read more
POSOCO Asks Power Exchanges To Bar 27 DISCOMs From Trading Until They Clear Dues Updated On Fri, Aug 19th, 2022 by Saurenergy According to sources, Power System Operation Corporation Ltd (POSOCO) has asked three power exchanges – IEX, PXIL, and HPX – to restrict electricity trading by 27 discoms in 13 states that owe gencos money. POSOCO has issued a directive to the Indian Energy Exchange (IEX), Power Exchange of India (PXIL), and Hindustan Power Exchange (HPX) […] Read more
Policy Muddle, Economy Trip Up US Clean Energy Growth In Q2, Says Industry Association Updated On Thu, Jul 28th, 2022 by Saurenergy According to a report from the American Clean Power Association (ACPA), a US body of mostly energy developers, the rate of clean energy deployment slowed substantially in the second quarter. The association’s report blames policy headwinds, economic factors and trade issues for impacting project development and increasing the backlog of new project delays. The report […] Read more