Tata Power Posts Financial Results; Boosted by Renewable Business Updated On Thu, May 21st, 2020 by Saurenergy Tata Power has announced its FY2019-20 financial results, reporting a strong end to the year in the Q4 and strong performance in the renewable business. Tata Power, India’s largest integrated power company, has announced its FY2019-20 financial results. The firm reported a strong end to the year in the fourth quarter with consolidated Profit After […] Read more
Shocker! ACME Bows Out From Rajasthan Project With Record Low Tariffs Updated On Wed, May 20th, 2020 by Saurenergy After surprising the world, and setting the stage for a period of record low tariffs in India with its bid at Rs 2.44 kWh for a SECI project in Rajasthan, the winner, ACME Solar, has opted to cancel the project. It had won the 600-Mw project in Rajasthan at a historic low rate of Rs […] Read more
World’s 1st Offshore Farm to use 9.5 MW Turbines Comes Online Updated On Fri, May 15th, 2020 by Saurenergy The 219 MW Northwester 2 offshore wind farm is now supplying the Belgian grid with green energy from all of its 23 fully wind turbines producing 9.5 MW each. In just under ten months from the start of the offshore works, the 219 MW Northwester 2 offshore wind farm is now supplying the Belgian grid […] Read more
GoodWe Unveils SDT G2 Series Inverters for Residential & Small Commercial Projects Updated On Thu, May 14th, 2020 by Saurenergy Leading inverter supplier GoodWe has launched its SDT G2 series inverter solution 17-25kW, its top of the line option for residential and small commercial projects. The company claims that the SDT G2 series is highly efficient, easy to install and integrates the most advanced safety features. It comes with a life-long free monitoring solution Smart […] Read more
India Must Intensify Policy Reforms to hit 60 GW Wind Target by 2022: Report Updated On Thu, May 14th, 2020 by Saurenergy Wind energy capacity in India can only realistically reach 50 GW by 2022, and the sector needs to intensify policy reforms to hit its 60 GW by 2022 target. According to a new report, wind energy capacity in India can only realistically reach 50 GW by 2022. And, efforts by the government to lower barriers […] Read more
Cracks in PVDF Backsheet Jumps Four-Fold between 4-9 yrs of Installation: DuPont Report Updated On Tue, May 12th, 2020 by Saurenergy The overall outer layer cracking rate of polyvinylidene fluoride (PVDF) backsheets increased by more than three times as compared to 2019, as revealed by DuPont in its latest 2020 Global Photovoltaic (PV) Reliability Report. The 2020 field report was compiled from inspection and analysis of nearly 3 GW of PV installations across the globe, spanning […] Read more
Seraphim Signs Agreement to Supply 183 MW Modules to Philippines Updated On Mon, May 11th, 2020 by Saurenergy Seraphim has announced that it has signed an agreement with ERS Energy to deliver 183 MW of high-efficiency solar modules for projects in the Philippines Jiangsu Seraphim Solar System (Seraphim), one of the world’s leading solar module manufacturers, recently announced that it has signed an agreement with ERS Energy Sdn Bhd to deliver 183 megawatts […] Read more
ST Integrates Common-Mode Filter, ESD Suppression in New Automotive-Protection Devices Updated On Fri, May 8th, 2020 by Saurenergy French-Italian semiconductor giant STMicroelectronics’ (ST) ECMF04-4HSM10Y and ECMF04-4HSWM10Y automotive-qualified common-mode filters (CMF) for high-speed serial buses protect interface ICs by integrating transient-suppression diodes with low clamping voltage. The company claimed that these are the first CMFs on the market with automotive-grade qualification and automotive surge compliance guaranteed. Also, they are not only produced and qualified according to AEC-Q101 […] Read more
GoI Extends CEL Divestment Bid Deadline for Second Time up to May 16 Updated On Fri, May 8th, 2020 by Saurenergy For the second time in a row, the Government of India (GoI) has extended the last date for submitting bids for its solar products manufacturing unit Central Electronics Ltd (CEL) by a month. Now, the extended last date and time of expression of interest (EoI) submission is May 16, 2020, at 11:00 hours, from its […] Read more