Sr. Engineer/Asst. Manager – Design – Solar Updated On Thu, Jan 11th, 2024 by Saurenergy To prepare the electrical design, SLD and layout for Rooftop & Ground mounted PV Projects To be responsible for selection of components, makes and specs of the various components used for Ground mounted PV Projects To clarify all concerns of the installation teams and amend drawings to as built conditions To work with procurement team […] Read more
DGTR Will Continue Anti-Dumping Duty On Chinese EVA Backsheets Updated On Thu, Jan 11th, 2024 by Saurenergy The Directorate General of Trade Remedies (DGTR) has recommended extending the anti-dumping duty on the import of Ethylene Vinyl Acetate (EVA) backsheets from China for an additional five years. A recent DGTR investigation revealed that EVA backsheets are still being exported to India at prices below their normal value. And this, according to DGTR, is […] Read more
E-Fuel Hybridization With Solar Can Improve Energy Production: IEA Updated On Wed, Jan 10th, 2024 by Saurenergy A latest report by the International Energy Agency (IEA) on, “Role of E-Fuel in Decarbonizing Transport”, studied the role of hybridization of E-Fuel with wind and solar as a solution in reducing carbon dioxide (CO₂) emission. The report stated, “E-Fuel have emerged as an alternative in situations where, the usage wind and solar resources is […] Read more
CIP Commences Construction Of 300 MW Wind Project With Envision Updated On Mon, Jan 8th, 2024 by Saurenergy Copenhagen Infrastructure Partners (CIP) through its Growth Markets Fund I (CI GMF I) have taken final investment decision (FID) on a 300 MW onshore wind project in India together with Viviid Renewables (Viviid), an Indian developer and balance-of-plant service provider. The project is located at Karnataka with favorable wind conditions, good site accessibility, and an […] Read more
Govt To Electrify 1L Unelectrified Tribal Households With Off-Grid Solar Updated On Fri, Jan 5th, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) is now all set to roll out a dedicated scheme to electrify the unelectrified households of Particularly Vulnerable Tribal Groups (PVTGs) under the Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN). The MNRE recently issued a notification in this regard. The order said that the ministry […] Read more
First Solar Signs PPA With Cleantech Solar To Procure 150 MW Facility Updated On Thu, Jan 4th, 2024 by Saurenergy First Solar, an American solar technology company entered into a 15-year, captive Power Purchase Agreement (PPA) with Cleantech Solar, a renewable energy solutions provider operating in India and Southeast Asia, the firm said. Under the agreement, Cleantech Solar will construct 150 megawatts (MW) of photovoltaic (PV) solar and 16.8 MW of wind-generating assets in Tamil […] Read more
Chandigarh Open Access Consumers May Get Green Power @Rs 6.75/unit Updated On Wed, Jan 3rd, 2024 by Saurenergy The Joint Electricity Regulatory Commission (JERC) for the state of Goa and Union Territories has now come up with a draft discussion paper to compute the green energy open access tariff in Chandigarh. This comes after the Union government issued a notification last year allowing green energy through open access to consumers even with less […] Read more
MNRE Approved Bihar’s Proposal Under PM KUSUM (Comp-C): Minister Updated On Thu, Dec 28th, 2023 by Saurenergy The Ministry of New and Renewable Energy (MNRE) in its latest reply before the Parliament said that the ministry approved the proposal of Bihar under Component C of the PM-KUSUM scheme. MNRE Minister RK Singh in his written statement before the Lok Sabha said that the state had moved an application to the Centre seeking […] Read more
Sustainment Project Manager Updated On Wed, Dec 27th, 2023 by Saurenergy PSP engineer responsible for coating equipment over their entire lifecycle, including documentation. Keep the bill of material (BOM) and documentation of coating equipment up-to-date Planning (strategic and operative) and realisation of PSP projects, while taking budget, cost and timeline into account. Duties & Responsibilities:- 1. Product Sustainment:- Responsibility of coating equipment over their entire lifecycle, […] Read more