NTPC Secures Highest VGF Support For CPSU Scheme Updated On Thu, Mar 13th, 2025 by Saurenergy NTPC has emerged as the largest beneficiary of the central government grant under the Central Public Sector Undertaking (CPSU) Scheme Phase-II (Government Producer Scheme). Latest data shared by the government before the Rajya Sabha revealed the levels of allocations given to different CPSUs. The government aids these CPSUs for setting up grid-connected Solar Photovoltaic (PV) […] Read more
OREDA Issues Tender, Seeking EPC Contractors For PM-KUSUM Updated On Thu, Mar 13th, 2025 by Saurenergy Odisha Renewable Energy Development Agency (OREDA) has issued a tender seeking EPC contractors to take up solarisation works under PM-KUSUM scheme. As per the mandate, the state nodal agency is seeking companies who can take up the works under the Component-A of the central government scheme. The OREDA tender said that the contractors need to […] Read more
Fraunhofer ISE Flags ‘Overstatement’ Of Output Claims By Module Manufacturers Updated On Thu, Mar 13th, 2025 by Saurenergy A research team from the Fraunhofer Institute for Solar Energy Systems ISE has evaluated over 70,000 power measurements on photovoltaic modules that have been carried out in the institute’s calibration laboratory, CalLab PV Modules, since 2012. In the process, the researchers found that since around 2017, the negative discrepancy between the performance data of the […] Read more
SWELECT Energy Secures 150 MW Module Order, Rises ₹290cr Updated On Wed, Mar 12th, 2025 by Saurenergy Solar energy company SWELECT Energy Systems Ltd today announced securing orders of over 150 MW for its TOPCon Bi-facial solar PV modules. Additionally, SWELECT Group has successfully raised ₹290 crore funding through Non-Convertible Debentures (NCDs) via a private placement with India Infradebt Limited, the company said. This move, secured against a portion of its Solar […] Read more
Assistant Manager- Module Process Updated On Fri, Mar 7th, 2025 by Saurenergy Responsibilities:- Responsible for improving lamination quality of the modules by meeting the lamination product /process CTQ’s. Stringer & laminator Recipe settings & troubleshooting. Documentation for new processes, WI, SOP, Process parameters Preparation of Pre lam EL data and rework monitoring and take corrective and preventative action for controlling Pre El rework. Coordinate with quality team […] Read more
Andhra Wins Over Premier Energies From Telangana With Plant Shift Updated On Fri, Mar 7th, 2025 by Saurenergy Premier Energies, a Hyderabad-based company, has decided to relocate its 4 GW Solar PV TOPCon cell manufacturing facility from Telangana to Andhra Pradesh. The company shared this update in its regulatory filing, stating, “For the implementation of the 4 GW Solar PV TOPCon Cell manufacturing, initially planned at UDL-5 Part in the Industrial Park, Seetharampur, […] Read more
Solidus Techno Power Appoints Shiva Kumar Ram As Director Of Operations Updated On Thu, Mar 6th, 2025 by Saurenergy Punjab-based Solidus Techno Power Pvt. Ltd. has appointed Shiva Kumar Ram as its Director of Operations. Ram comes with a career spanning over three decades in power generation, renewable energy, and strategic project execution, Ram is set to elevate Solidus Techno Power’s operations. Solidus has been on an accelerated growth streak in the past year, […] Read more
Saurenergy Explains: AC Block vs DC Block – Battle of BESS Updated On Thu, Mar 6th, 2025 by Saurenergy Renewable energy sources struggled to become a reliable alternative to fossil-based power for long. The Utility-scale battery energy storage systems (BESS) emerged as a panacea to renewable woes, with new renewable projects now even accommodating BESS as a part of the project. The landscape of utility-scale BESS is also now witnessing a dynamic evolution, with […] Read more
PM-KUSUM: Shakti Pumps Bags ₹23.91Cr. Work Order From MEDA Updated On Wed, Mar 5th, 2025 by Saurenergy Madhya Pradesh-based solar pump and motor manufacturer Shakti Pumps (India) Limited recently received a Letter of Award (LoA) from the Maharashtra Energy Development Agency (MEDA). The company secured the award under Component B of the PM-KUSUM scheme to set up 877 Solar Photovoltaic Water Pumping Systems (SPWPS) at various locations across Maharashtra. The work order […] Read more