South Africa Announces 8 Bidders For 1.76 GW RE Projects Updated On Thu, Dec 26th, 2024 by Saurenergy South African Electricity and Energy Minister, Kgosientsho Ramokgopa recently appointed eight preferred bidders to develop eight renewable energy projects. These projects will be developed under the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) Bid Window 7. The project has a combined contracted capacity of 1.76 GW. It further awarded the project to eight preferred […] Read more
NHPC Opens Bids For 1.2 GW Wind-Solar Hybrid Tender Updated On Thu, Dec 26th, 2024 by Saurenergy NHPC recently issued a tender to select developers for a 1.2 GW wind-solar hybrid project, with or without energy storage systems. The project includes a greenshoe option, and bids are invited until January 16, 2025. The bidders may use technology-agnostic resources such as crystalline silicon, thin film, or CPV technologies, with or without trackers, for […] Read more
NTPC Issues Tender To Build Solar Trees For Its Bongaigaon Project Updated On Thu, Dec 26th, 2024 by Saurenergy NTPC recently issued a tender to build and commission solar trees for the NTPC’s Bongaigaon project located in Assam. It invited the bids till December 30, 2024. The NTPC project will be located at the Bongaigaon Thermal Power Project, managed by NTPC’s Central Procurement Group – 2, Sipat Super Thermal Power Station in Chhattisgarh. The […] Read more
The 10 Big Milestones That Will Define India’s RE Sector In 2025 Updated On Thu, Dec 26th, 2024 by Saurenergy The Indian renewable energy market witnessed several historic events in 2024. These include policy changes, diversified and copious tenders, a record pace of green project installations, bulging order books across manufacturers, EPCs and more. While the overarching focus of the year was to be self-reliant in manufacturing, with real progress finally visible, China still cast […] Read more
SECI Floats 125 MW/500 MWh BESS Tender in Kerala With VGF Updated On Thu, Dec 26th, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) recently released a tender to set up a 125 MW/500 MWh standalone Battery Energy Storage System (BESS) in Kerala with Viability Gap Funding (VGF) support. The last date for bid submission is set as February 6, 2025. This marks the 22nd standalone BESS tender in India. This is […] Read more
China’s Polysilicon Leaders Announce Production Cuts To Arrest Low Prices Updated On Thu, Dec 26th, 2024 by Saurenergy Tongwei Group and Daqo New Energy, two of the world’s largest, and China’s largest producers of solar grade polysilicon materials, have announced a cutback on production of high-purity polysilicon amid falling prices and financial losses. The firms ended H1 of 2024 with significant losses from their operations, and in likelihood, H2 has been no better. […] Read more
Winning Bids Cross Rs 3/kWh In SECI’s 1 GW Solar Tender Updated On Thu, Dec 26th, 2024 by Saurenergy In an ominous sign of changing market dynamics, SECI’s 1000 MW Tranche XVIII tender for ISTS connected solar projects has attracted winning bids, all over Rs 3/kWh. The tender, released in September this year, has ReNew Solar Power( 250 MW at Rs 3.04), Acme Solar holdings (300 MW at Rs 3.05) and Adani Green Energy […] Read more
Germany Sets New Price Ceilings for 2025 Renewable Energy Auctions Updated On Tue, Dec 24th, 2024 by Saurenergy Bundesnetzagentur, the German independent federal authority that regulates and oversees infrastructure markets recently set new determinations setting price ceilings for the renewable energy generation auctions to be held in 2025. The organization set the price ceilings of 6.80 cents per kilowatt hour (ct/kWh) for ground-mounted solar photovoltaic (PV) systems, 7.35 ct/kWh for onshore wind, 9.00 […] Read more
NTPC-REL Floats 1.4 GW Tender To Build UP Solar Parks Project Updated On Tue, Dec 24th, 2024 by Saurenergy NTPC Renewable Energy, a subsidiary of NTPC Green Energy, has issued a tender to develop a 1,400 MW grid-connected solar project in two solar parks, namely Lalitpur (2×300 MW) and Chitrakoot (2×400 MW), in Uttar Pradesh (UP). The tender invites bids until January 13, 2025. The tender offers a Balance of System (BoS) package for […] Read more