Manager- Solar Site Quality_Electrical Updated On Thu, Mar 27th, 2025 by Saurenergy Ensuring installations are carried out as per approved FQP’s. Supervise & Monitor quality work at project site. Prepare and revise FQAP and checklists. Ensure Quality work through our own Engineers and TPAs. Ensure that NCs are minimised and are closed quickly, and verification of RCA and Corrective actions. Imparting Job specific trainings at site. Auditing […] Read more
Bridge & Roof Invites Bids For 100 MW Solar Project In Rajasthan Updated On Thu, Mar 27th, 2025 by Saurenergy Bridge and Roof, a conglomerate that provides EPC services through various modes of contract has recently issued a tender inviting bids to develop a 100 MW (AC) solar project. This project belongs to SJVN Green Energy at Nawa, Didwana Kuchaman, in Rajasthan. The developer of this project is expected to undertake EPC activities, including three […] Read more
SASA Plans To Add 600 MW Of TOPCon Module Manufacturing Updated On Thu, Mar 27th, 2025 by Saurenergy Gujarat-based solar module manufacturer SASA Energy is gearing up for a significant expansion. The company, which currently has a total of 150 MW of solar module manufacturing capacity, is now adding 600 MW of new capacity. The firm, which is now focussing on mono-PERC, has planned to completely shift its production to TOPCOn with its […] Read more
NHPC Floats 1.2 GW Solar Tender With 600 MWh ESS Updated On Thu, Mar 27th, 2025 by Saurenergy NHPC has issued a tender to develop a 1.2 GW solar project with a 600/2400 MWh energy storage system. It is open to accepting bids till April 24, 2025. NHPC, in its tender, mentioned that the project should include an energy storage system (ESS) of at least 0.5 MW/2 MWh capacity for each 1 MW […] Read more
MERC Approves ₹2.19 Lakh/MW Tariff for MSEDCL’s BESS Project Updated On Thu, Mar 27th, 2025 by Saurenergy The Maharashtra Electricity Regulatory Commission (MERC) has approved the development of the Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) 1.5 GWh Battery Energy Storage System (BESS) project. MERC approved a tariff of ₹2,19,001/MW/Month for 12 years in response to Maharashtra State Electricity Distribution Co. Ltd’s (MSEDCL) petition for procuring 250 MW/500 MWh (base capacity) and […] Read more
Senior Mechanical Engineer – FEA Updated On Wed, Mar 26th, 2025 by Saurenergy Ensure the new product compliance to seismic requirements, shipping standards, Fatigue lifecycle study and other mechanical requirements (i.e., transportation loads, wind loads, lifting loads, internal pressure, ice & snow loading, etc.) Experience in structural design codes: EN 1993, ISO 1496, IBC-2018, ASCE 7-16, ASTM-D1469 and Convention for Safe Containers (CSC-1972). Iterate designs based on results […] Read more
Principal Electrical Systems Engineer – Battery Storage Updated On Wed, Mar 26th, 2025 by Saurenergy Responsibilities:- Develop and oversee system architecture for multi-MW BESS projects, integrating battery systems, power conversion systems (PCS), transformers, communication hardware, controls, and auxiliary power systems. Review system requirements, ensuring compatibility and performance across all components. Drive the overall electrical system design and validation process. Lead advanced load flow studies, short-circuit analysis, protection coordination, Harmonic , […] Read more
Head Product Assurance Industrial Services Updated On Wed, Mar 26th, 2025 by Saurenergy The Product Assurance – Industrial Head will lead and manage the Industrial Product Assurance team, driving business growth through effective sales and service delivery. The role involves strategic planning, managing customer relationships, and ensuring the successful execution of projects while achieving financial targets. The Product Assurance Industrial Head, is responsible for leading and managing the […] Read more
NTPC Hits 59.4 GW Standalone Capacity With New PV Project Updated On Wed, Mar 26th, 2025 by Saurenergy NTPC today announced the commissioning of its 245 MW Nokh Solar Project in Rajasthan. In its latest regulatory filing, the company said, “With this, the total installed and commercial capacity of NTPC, on a standalone and group basis, has now reached 59,413 MW and 77,806.50 MW, respectively.” NTPC achieved this milestone after operationalizing the third […] Read more