Shakti Pump Secures Land To Setup Solar Cell, Module Manufacturing Facility Updated On Thu, Mar 13th, 2025 by Saurenergy Madhya Pradesh-based solar pump company, Shakti Pumps, has recently secured land for setting up a solar cell and PV module manufacturing facility using wafers as input material. The company announced this development in a regulatory filing, stating, “Madhya Pradesh Industrial Development Corporation Limited (MPIDC) has sanctioned 113 acres of land to our wholly owned subsidiary, […] Read more
Protection Testing and Commissioning Engineer Updated On Thu, Mar 13th, 2025 by Saurenergy Act as the responsible commissioning engineer overseeing the installation and commissioning of Bay level secondary equipment’s. Manage completion of all commissioning activities efficiently and cost-effectively and in accordance with contract specifications, quality standards, and safety requirements. Responsibilities:- Act as Testing & commissioning engineer for medium to high complex projects. Responsible for commissioning and troubleshooting of […] Read more
SolaX Power to Launch Micro-Inverters for Indian Market Soon Updated On Wed, Mar 12th, 2025 by Saurenergy Global solar inverter brand SolaX Power is set to introduce its latest innovation—solar micro-inverters—tailored for the Indian market. The company is in the final stages of launching these inverters, specifically designed for smaller residential rooftop solar installations. The move gains significance with the introduction of the PM Surya Ghar scheme, which supports compact solar setups […] Read more
Production Engineer – Module Production Updated On Fri, Mar 7th, 2025 by Saurenergy Responsibilities:- Manpower allocation/ Ensure cleaning activity of critical machines/ 100% production adherence as per plan for respective shift 5S Activity / identify safety hazard and timely closure of Near miss/incident investigation if any. Communication with PPC team with respect to production order and RM Line in charge meeting with operator Defect discussion/production output Verification of […] Read more
Module Demand To Rise Significantly In FY26, FY27: SBI Caps Updated On Wed, Mar 5th, 2025 by Saurenergy A latest report from SBI CAPS claimed that the annual module demand is likely to touch 100 GW soon. The report said the higher demand is likely to be triggered with the faster pace of adoption of solar power. The report also said that the faster pace of PM Surya Ghar scheme installations could also […] Read more
PM-KUSUM: Shakti Pumps Bags ₹23.91Cr. Work Order From MEDA Updated On Wed, Mar 5th, 2025 by Saurenergy Madhya Pradesh-based solar pump and motor manufacturer Shakti Pumps (India) Limited recently received a Letter of Award (LoA) from the Maharashtra Energy Development Agency (MEDA). The company secured the award under Component B of the PM-KUSUM scheme to set up 877 Solar Photovoltaic Water Pumping Systems (SPWPS) at various locations across Maharashtra. The work order […] Read more
Business Development Professional – HV AIS/GIS Updated On Tue, Mar 4th, 2025 by Saurenergy Analyze SLD, Section drawings, technical specifications of GIS substation and configure suitable GIS solutions based on site layout conditions Preparation of GIS engineering drawings based on various configurations in line with technical scope adopting to substation configuration rules. Very good application know to ensure technically compliant solutions are proposed at pre bid/offer stage. Submission of […] Read more
Inconsistent Policies On Hybrid Inverters Affecting Growth: Tiku Updated On Tue, Mar 4th, 2025 by Saurenergy Notwithstanding the clarity coming from the Ministry of New and Renewable Energy (MNRE) on the applicability of hybrid inverters PM Surya Ghar, its adoption seems to be hit by several hurdles. Inverter manufacturers said that the lack of clarity on the policy has affected their growth in the country. The companies believe that the hybrid […] Read more
Module Scarcity Delaying Solar Projects In India, Hints NLC India Updated On Mon, Mar 3rd, 2025 by Saurenergy Indian Public Sector Utility (PSU), NLC India has hinted that the delay in the supply of domestic solar modules in the country is leading to delays in solar projects. The top management of the firm in a recent investor’s call revealed that the demand for domestic modules has led to a shortage of timely delivery […] Read more