ACME’s 1st Wind Project Gets Bigger With 19.8 MW Capacity Addition Updated On Fri, Jun 13th, 2025 by Saurenergy Indian renewable energy developer ACME Solar Holdings has announced adding 19.8 MW of additional wind energy capacity in its first wind energy project in Gujarat. The Gurugram-based company had initially commissioned 26.4 MW of wind capacity in this project. With the inclusion of the newly commissioned project, the cumulative capacity of the project has reached […] Read more
ACME Solar’s RE Capacity Surpasses 2.8 GW With New Projects Updated On Tue, Jun 10th, 2025 by Saurenergy ACME Solar Holdings Limited has commissioned an additional 75 MW of renewable energy capacity at its Sikar Solar Project in Rajasthan. This adds to the previously commissioned 165 MW at the site, bringing the total operational capacity at the project to 240 MW out of a planned 300 MW. With this addition, ACME Solar’s total […] Read more
Arctech, ACME Ink 175 MWp Solar Tracker Supply Pact Updated On Mon, Jun 2nd, 2025 by Saurenergy Arctech, a provider of solar tracking, racking, and building-integrated photovoltaic (BIPV) solutions, has signed a contract with ACME Cleantech Solutions to supply 175 MWp of solar trackers for a 300 metric tonnes per day (MTPD) green ammonia project in Duqm, Oman. ACME Cleantech, a fully integrated renewable energy company in India, has a diversified portfolio […] Read more
APTEL’s Relief To ACME Over COVID-Linked ‘Force Majeure’ Updated On Thu, Feb 6th, 2025 by Saurenergy The Appellate Tribunal For Electricity (APTEL) has now ordered in favour of ACME Heergarh Powertech Private Limited in a case related to force majeure, triggered by the COVID pandemic. The judgment was passed after the petitioner (ACME) approached the apex body by challenging an impugned order, earlier passed by the Maharashtra Electricity Regulatory Commission (MERC). […] Read more
ACME’s Subsidiary Secures Rs. 1,988 Cr Financing From PFC Updated On Thu, Dec 26th, 2024 by Saurenergy ACME Renewtech Private Limited, a subsidiary of Haryana-based ACME Solar Holdings (ACME Solar) recently secured Rs. 1,988 crore term loan financing from Power Finance Corporation (PFC). This financing will fund the development and construction of a 300 MW Solar-Wind Hybrid Renewable Energy Project. The project will be located in high-resource potential areas, with solar capacity […] Read more
Jevargi, Juniper, Avaada, and ACME Secure 1.2 GW FDRE Tender Updated On Thu, Dec 12th, 2024 by Saurenergy NHPC, has announced the winners of its 1.2 GW Firm and Dispatchable Renewable Energy (FDRE) VI auction. It awarded the bids to four winners: Jevargi Solar Power (Rays Power Infra), Juniper Green Energy, Avaada Energy, and ACME Solar Holdings. The tender for this project was released in June this year, and the results have been […] Read more
ACME Sun Power Secures Rs.3,753 Crore Loan From REC For FDRE Projects Updated On Mon, Nov 18th, 2024 by Saurenergy ACME Solar Holdings’ subsidiary, ACME Sun Power Private Limited, has secured a Rs. 3,753 crore term loan from REC Limited. This financing is extended to support the development and construction of a 320 MW Firm and Dispatchable Renewable Energy (FDRE) project in collaboration with SJVN. The Gurugram-based company’s recent project are planned to be located […] Read more
Green Stocks Nov 13: Acme Makes Tepid Debut, Reshuffle In Green Pack Updated On Wed, Nov 13th, 2024 by Saurenergy On a big day for green energy developers, one of the pioneering firms, Acme Solar finally listed on the bourses today. When we last checked, the price of Rs 255.15 which was below its cut off price of Rs 289, which will mark one of those rare occasions when a green energy stock has listed at […] Read more
Hexa Climate, ACME And Avaada Energy Secure NTPC’s FDRE Tender Updated On Sat, Nov 9th, 2024 by Saurenergy NTPC Limited has now declared Hexa Climate Solutions, ACME Solar Holdings, and Avaada Energy as the winners of its 1,200 MW Firm and Dispatchable Renewable Energy (FDRE) auction. The tender for this project was issued in June this year, and the results were released within four months. Only 760 MW of the 1.2 GW was […] Read more