Wind
BlackRock to Invest up to INR 3000 Crore in Aditya Birla Renewables
FDRE Projects Could Reach Cost Parity with New Thermal Plants By 2030: Report
India Achieves 50% Non-Fossil Power Capacity Milestone, Accelerates Drive Toward Net Zero
Rystad Energy Projects Almost 300% Jump in Onshore Wind for SE Asia
Envision Energy Breaks Ground on 2 GW Wind Turbine Blade Manufacturing Factory in Gujarat
Tamil Nadu Unveils 12 GW Renewable Push for South Asian Renewable Energy Corridor
Oil India, RRVUNL Form 50:50 Joint Venture for Renewable Energy in Rajasthan
/saur-energy/media/agency_attachments/2025/06/20/2025-06-20t080222223z-saur-energy-logo-prasanna-singh-1-2025-06-20-13-32-22.png)
/saur-energy/media/media_files/2025/12/10/blackrock-to-invest-up-to-inr-3000-crore-in-aditya-birla-renewables-2025-12-10-11-31-03.jpg)
/saur-energy/media/media_files/2025/12/09/fdre-2025-12-09-15-05-49.jpg)
/saur-energy/media/post_attachments/2018/07/solar-and-wind.jpg)
/saur-energy/media/media_files/2025/12/02/india-achieves-50-per-cent-non-fossil-power-capacity-milestone-2025-12-02-16-09-17.jpg)
/saur-energy/media/media_files/2025/11/28/renwable-energy-generation-2025-11-28-15-44-45.jpg)
/saur-energy/media/media_files/2025/10/01/rystad-energy-projects-almost-300-percent-jump-in-onshore-wind-for-se-asia-2025-10-01-11-29-24.jpg)
/saur-energy/media/media_files/2025/09/25/envision-energy-breaks-ground-on-2-gw-wind-turbine-blade-manufacturing-factory-in-gujarat-2025-09-25-12-30-22.jpg)
/saur-energy/media/media_files/2025/09/25/trump-administration-axes-usd-13-billion-in-green-energy-funds-2025-09-25-11-52-22.jpg)
/saur-energy/media/media_files/2025/09/24/tamil-nadu-unveils-12-gw-renewable-push-for-south-asian-green-energy-corridor-1-2025-09-24-11-18-05.jpg)
/saur-energy/media/media_files/2025/09/12/oil-india-and-rrvunl-form-5050-joint-venture-for-renewable-energy-in-rajasthan-2025-09-12-11-00-18.jpg)
/saur-energy/media/media_files/2025/09/16/cosmic-2025-09-16-13-53-51.jpg)