Germany Sets New Price Ceilings for 2025 Renewable Energy Auctions Updated On Tue, Dec 24th, 2024 by Saurenergy Bundesnetzagentur, the German independent federal authority that regulates and oversees infrastructure markets recently set new determinations setting price ceilings for the renewable energy generation auctions to be held in 2025. The organization set the price ceilings of 6.80 cents per kilowatt hour (ct/kWh) for ground-mounted solar photovoltaic (PV) systems, 7.35 ct/kWh for onshore wind, 9.00 […] Read more
Websol Energy Update-600MW Cell Line At Falta Location Updated On Tue, Dec 24th, 2024 by Saurenergy Kolkata based Websol Energy System Limited, one of the oldest solar cell makers in the country, has provided an update on its upcoming 600 MW cell at its FALTA SEZ plant. The firm has informed the stock exchanges that the Company has placed purchase order for equipments and has made advance payments for the said […] Read more
Odisha: IREDA Has Sanctioned Over Rs.3,000 Cr For Green Energy Projects Updated On Tue, Dec 24th, 2024 by Saurenergy Pradip Kumar Das, Chairman and Managing Director (CMD), Indian Renewable Energy Development Agency Limited (IREDA) reaffirmed its commitment to Odisha’s ambitious renewable energy target. The CMD emphasized the state’s vision of achieving 10 GW capacity by 2030. Highlighting its support, the Indian Renewable Energy Development Agency Limited (IREDA) has already sanctioned over Rs. 3,000 crores […] Read more
Green Stocks Dec 23: Green Stocks Fail To Move With Market Recovery Updated On Mon, Dec 23rd, 2024 by Saurenergy A smart recovery in the market today was not enough to do the same to more in our green energy pack, as most stocks struggled to recover from losses last week. The exceptions, Sterling and Wilson Renewable, which was up 5.5% on the back of a big order win announcement, or Shakti Pumps, still finding […] Read more
Livguard Unveils Integrated Drivetrain Solutions At EV Expo 2024 Updated On Mon, Dec 23rd, 2024 by Saurenergy Haryana-based Livguard, under the SAR Group, unveiled Integrated Drivetrain Solutions at the EV Expo 2024 in Delhi. This comprehensive solution includes critical components such as the motor, controller, battery, and charger, specifically designed for electric two-wheelers, e-rickshaws, and L5 vehicles (e-autos). By consolidating all key drivetrain components under one roof, Livguard ensures seamless compatibility and […] Read more
India Needs Over A Million Additional Engineers by 2050 for RE Vision: IREDA Chief Updated On Mon, Dec 23rd, 2024 by Saurenergy Pradip Kumar Das, Chairman and Managing Director (CMD) of Indian Renewable Energy Development Agency Ltd. (IREDA), addressed the Visionary Talk hosted by the 39th Indian Engineering Congress at Kolkata on 20th December 2024. In his address, CMD, IREDA spoke about the critical need for talent to drive the Renewable Energy sector both in India and […] Read more
SustVest Raises Rs 14 crores in Pre-Series A Round Updated On Mon, Dec 23rd, 2024 by Saurenergy Sustainable Investment Platform SustVest Raises $1.7 Million in Pre-Series A Round Led by Inflection Point Ventures and Antler SustVest claims to be India’s first regulated platform for sustainable investments, offering investments in renewable energy. It delivers 12-14% XIRR returns with monthly payouts while enabling C&I consumers to access zero-cost solar projects, reducing electricity costs by […] Read more
SJVN Green Invites Bids For 1.352 GW PM-KUSUM Comp-C Project In Maharashtra Updated On Mon, Dec 23rd, 2024 by Saurenergy As part of its efforts to increase the implementation of feeder-level solarization under Component-C of PM-KUSUM, SJVN subsidiary SJVN Green has now released a tender to install 1,352 MW capacity through solar power projects across 102 locations in four districts of Maharashtra. These districts are Pune, Nashik, Ahmednagar, and Solapur. SJVN Green is accepting bids […] Read more
CERC Lays Down Process For Scheduling of Infirm RE Power After COD Updated On Mon, Dec 23rd, 2024 by Saurenergy The Central Electricity Regulatory Commission (CERC) published the Indian Electricity Grid Code (IEGC) Regulations, 2023, which came into effect on October 1, 2023. Amendments and orders have been issued to address difficulties in implementing certain provisions. The commission has the power to issue Removal of Difficulties order where it feels the intent of the rules […] Read more