Independent Engineering Senior Consultant Updated On Wed, Sep 18th, 2024 by Saurenergy Focus on providing various clients with engineering advice and technical solutions on different projects Key Accountabilities:- Technical due diligence, techno-economic viability, feasibility studies, detailed project reports covering review of technology, design, contracts, infrastructure, permits and clearances, land area analysis, risk analysis, financial model. Should have strong knowledge of Contracts and Agreements for the development of […] Read more
NGEL-RVUNL Ink JV Deal for Renewable Energy in Rajasthan Updated On Wed, Sep 18th, 2024 by Saurenergy NTPC Green Energy Limited (NGEL), the subsidiary of NTPC Limited has now inked a Joint Venture Agreement with Rajasthan Rajya Vidyut Utpadan Nigam Limited. The two organizations agreed to join hands to move ahead with green energy and green hydrogen projects in Rajasthan. The deal was finalized in Jaipur. Rajasthan CM Bhajan Lal Sharma attended […] Read more
Senior Engineer – Production Updated On Tue, Sep 17th, 2024 by Saurenergy Determine/ Update the annual production plan (capacity) keeping in view the parameters of machine lead time, manpower deployment, breakdown trends, Business target & ABP, etc Co-ordinate Sales, Sales planner & Operating planning discussions as per laid guidelines; Formulate the monthly production plan based on the monthly planning and create weekly production plans in accordance with […] Read more
Lead Cell Maintenance AGM Updated On Tue, Sep 17th, 2024 by Saurenergy Roles and Responsibilities:- Managing the entire cell machines, equipment’s, utilities and project maintenance of entire high volume cell manufacturing lines for running the operations 24*7*365 days. Leading a large size team of technical resources including engineers for smooth functioning of maintenance activities in all shifts for 365 days of operation. Monitoring & maintaining the schedule […] Read more
Manager Renewable Engineering (Control & Instrumentation Engineer) Updated On Tue, Sep 17th, 2024 by Saurenergy We are seeking a leading role in the Renewable Engineering Control & Instrumentation (C&I) division for our Renewable Energy (RE) Power Plants which will be a mix of Solar, Wind, and BESS systems. This position is responsible for C&I engineering which includes major development of control architecture of complete solar + wind + BESS Hybrid […] Read more
System Design Engineer Updated On Tue, Sep 17th, 2024 by Saurenergy Roles & Responsibilities:- In-house drawings and technical specifications for electrical works (BOM, BOQ, RFP) Design & Drawing of electrical systems for medium and large-scale PV systems (DC, AC, LV, HV, communication systems/SCADA, Earthing, Lightning protection and Illumination Calculation). Preparation of Design Documents such as RFP, GTP etc. Preparation of drawing for various projects such as […] Read more
Re-Invest 2024- Firms Parade 480 GW Capacity Addition Plans Updated On Tue, Sep 17th, 2024 by Saurenergy At the fourth edition of Re-invest 2024, you might be tempted to believe that India’s renewable energy targets are as good as met. At least, going by the line up of firms queuing up to make their commitments public. In a spectacle suitably titled ‘Shapath Patra’ or agreements signed at the event, firms made the […] Read more
Insolation Energy Announces 3rd Manufacturing Plant In Jaipur Updated On Mon, Sep 16th, 2024 by Saurenergy Insolation Energy (INA Solar)has announced the ground breaking ceremony of its new state-of-the-art manufacturing facility, located on the Delhi-Ajmer Expressway in Sawarda, Jaipur, Rajasthan. This investment of Rs 400 crore is a part of the company’s effort to strengthen its position in India’s renewable energy sector and expand its production capacity. Post the expansion, Insolation’s […] Read more
SJVN Invites Bids For 600 MW/2,400 MWh ESS Across India Updated On Mon, Sep 16th, 2024 by Saurenergy SJVN, in coordination with the Renewable Energy Implementation Agency (REIA), has released a 1.2 GW tender for solar plus energy storage. The tender invites bids from Solar Power Developers (SPDs) to set up ISTS-connected Solar PV Power Projects with 600 MW/2,400 MWh Energy Storage Systems (ESS) anywhere in India under Tariff-Based Competitive Bidding on a […] Read more