Kosol Energie Secures Module Order For NTPC’s Khavda Project Updated On Wed, Apr 9th, 2025 by Saurenergy Kosol Energie has secured a 400 MW photovoltaic (PV) module supply order through Zetwerk, as part of the larger 1,515 MWp PV module requirement for NTPC’s Khavda Solar Project in Gujarat. The order includes the supply of 550W bifacial modules, which are designed for tracker-mounted installations to improve power generation efficiency. The modules will be […] Read more
Private Sector-led DRE Solutions Need To Triple Investments: ISA Updated On Wed, Apr 9th, 2025 by Saurenergy Ashish Khanna, Director General of the International Solar Alliance (ISA), on Wednesday called for tripling private-sector investments in distributed renewable energy (DRE) solutions, saying such efforts are vital to scale up innovation and access. Speaking at the South Asia Forum for Distributed Energy (SAFDE) 2025 in New Delhi, Khanna said the private sector must lead […] Read more
The Hoymiles Truck Blazes A Trail In South India Updated On Wed, Apr 9th, 2025 by Saurenergy As India’s solar market expands, a notable expansion has been seen in the rooftop sector where the PM Suryaghar Scheme has catalysed demand in a big way. This rising demand across the country has also created a need for solar firms to look at new ways of reaching potential customers. Global solar and energy storage […] Read more
Recruitment of Experienced Professionals on Fixed Term Basis in Renewable Energy area Updated On Mon, Apr 7th, 2025 by Saurenergy NTPC Green Energy Limited (NGEL), a subsidiary of NTPC Ltd. has presence in the renewable power and hydrogen generation business. Commensurate with our country’s growth challenges, the company has embarked upon an ambitious plan to attain a total installed capacity of 60 GW by 2032. NGEL is looking for experienced professionals for Renewable Energy area […] Read more
Senvion India Launches 3.1M130 Wind Turbine With RLMM Entry Updated On Fri, Apr 4th, 2025 by Saurenergy Senvion India’s 3.1M130 wind turbine has been included in the Ministry of New and Renewable Energy’s (MNRE) Revised List of Models and Manufacturers (RLMM) issued in April 2025, the company said. It plans to begin grid-connected commercial installations across the country soon. The Indian firm, owned by Saudi based Alfanar group hopes to wrest a […] Read more
No Viability Gap Funding Released For BESS In FY25: Govt Updated On Fri, Apr 4th, 2025 by Saurenergy The Ministry of New and Renewable Energy (MNRE) said that it has not issued any viability gap funding (VGF) for battery energy storage system in FY25. The Union Cabinet approved the Viability Gap Funding (VGF) scheme for Battery Energy Storage Systems (BESS) on September 6, 2023, to support sector development. Under the scheme guidelines, 10% of […] Read more
Site Manager – Electrical Updated On Fri, Apr 4th, 2025 by Saurenergy You shall perform the following functions including but not limited to:- Perform field quality inspections, materials inspections, and raise Requests for Inspection (RFI). Ensure non-conformities (NC) are addressed as per client requirements, and close NC issues with proper documentation. Prepare daily inspection reports, PowerPoint presentations, quality assurance documents, NC log sheets, and other related reports […] Read more
Senior Design Engineer Updated On Thu, Apr 3rd, 2025 by Saurenergy Design of DC side electrical engineering related Medium and large-scale Solar Photovoltaic Power Ability to provide cost-optimized design of the arrangement of the PV plant layout. Shall be Familiar with Energy yield simulation in PV Syst. Shall be able to select the Solar PV Modules types and ratings, PV module installation Optimum DC rating of […] Read more
CEA Clarifies On New Energy Storage Rule Updated On Wed, Apr 2nd, 2025 by Saurenergy The Ministry of Power (MoP) has amended its provisions to clarify that ongoing government schemes, such as the PM Surya Ghar Muft Bijli Yojana, will continue under their existing rules without new energy storage mandates. It further specified that the energy storage system (ESS) co-location requirement applies only to future solar tenders and not to […] Read more