Trimark Wins SCADA Mandate for 2165MWh Terra Gen Storage Project Updated On Thu, Feb 18th, 2021 by Saurenergy Trimark Associates, has won the rights to the SCADA portion of the Edwards & Sanborn project, the world’s largest solar-plus-storage (PV+BESS) project currently under construction. Located in Kern County, California, the project weighs in at 1,118 megawatts (MW) of solar and 2,165 megawatt-hours (MWh) of energy storage. The project is owned by Terra-Gen, while Mortenson Construction acts as the Engineering, […] Read more
Vegas-based Barrel Energy Signs MoU for Lithium Battery Production in India Updated On Fri, Feb 12th, 2021 by Saurenergy Las Vegas-based Barrel Energy has signed an MoU to partner with Roshan Energy for Lithium Battery development and production in India and NA. Las Vegas-based Barrel Energy, an energy and minerals sector player, has announced that it has signed a Memorandum of Understanding (MoU) to enter a partnership with Roshan Energy Technologies, located in Hyderabad, […] Read more
20GW Signed Contracts Prove the High Reliability and the Investment Value of 182mm Modules Updated On Wed, Feb 10th, 2021 by Saurenergy With the beginning of the “14th Five-Years Plan”, the PV industry market has continued to heat up, and large-size modules have progressively earned growing popularity in PV market. According to the industry expectation, by the end of 2021, the production capacity of 182mm modules may exceed 100GW and the most mature product capacity planning will match […] Read more
Hindustan Zinc Signs MoU with Epiroc for Using BEVs in Underground Mining Updated On Tue, Feb 9th, 2021 by Saurenergy India’s integrated producer of Zinc-Lead and Silver and a Vedanta Group Company, Hindustan Zinc Limited (HZL) has signed a Memorandum of Understanding with Epiroc Rock Drills AB for Zero Emission and Sustainable Mining by introducing Battery Electric Vehicle (BEV) in underground mining. HZL claims to become the first mining company in India to introduce electric […] Read more
The Transition to EVs in India Will Require Rs 19.7 Lakh Crore Investment: Report Updated On Tue, Feb 2nd, 2021 by Saurenergy The transition to EVs in India will require a cumulative investment of Rs 19.7 lakh crore in EVs, charging infrastructure, & batteries by 2030 A new report by NITI Aayog and Rocky Mountain Institute (RMI) has found that the transition to electric vehicles (EVs) in India will require a cumulative capital investment of USD 266 billion (Rs 19.7 lakh crore) in EVs, […] Read more
LONGi Launches New 66C Type Hi-MO 4m Module for Global DG market Updated On Tue, Feb 2nd, 2021 by Saurenergy LONGi, a leading solar technology company headquartered in Xi’an, China, has officially launched its new 66C type Hi-MO 4 monofacial PV module (Hi-MO 4m) for the global distributed generation (DG) market. With an area of about 2 m2, weight of 22kg and power of 410-420W, the new module can be widely used on rooftops in […] Read more
WAAREE Supplies 23 KwH Li-Ion Batteries to ACE Ltd for Forklifts Updated On Mon, Feb 1st, 2021 by Saurenergy Surat based Lithium-Ion Batteries manufacturer, WAAREE ESS Pvt. Ltd has recently designed, developed, and supplied a high capacity 23KWhr lithium battery for 3 Ton forklift applications of ACE Ltd (Action Construction Equipment Ltd). These forklifts outfitted with WAAREE lithium batteries have now been deployed at Chennai airport and operating for 12 hrs per day. The […] Read more
Corporate Renewable PPAs in India may Increase in 2021: Report Updated On Fri, Jan 29th, 2021 by Saurenergy A report has found that corporate renewable power purchase agreements (PPAs) in India may increase in 2021, despite setbacks from COVID-19. A new report has found that corporate renewable power purchase agreements (PPAs) in India may increase in 2021, despite setbacks from COVID-19. The report by the World Business Council for Sustainable Development (WBCSD), shows […] Read more
Senior Manager – Supply Quality (Electrical) Updated On Wed, Jan 27th, 2021 by Saurenergy Roles & Responsibilities: Understanding customer requirements during bidding, highlighting deviation approvals required if any. Budget preparations for material inspections in project execution. New Vendor assessments proposed by procurement. Preparation of MQAP / Revision w.r.t to learnings at frequent intervals. Failure analysis with vendors if any during FAT, Stage insp. & Type Test. Material stage & […] Read more