HSE Lead _Site Management – LPT India Cluster Updated On Fri, Apr 25th, 2025 by Saurenergy The LPT Project Site Safety Professional is responsible for ensuring the effective implementation of Health, Safety, and Environmental (HSE) standards at the project site in alignment with GEA’s India cluster policies to make for sustainable HSE culture in GEA. · The role involves monitoring site activities, conducting risk assessments, ensuring compliance with legal and corporate […] Read more
Lead Manufacturing Specialist – Operation Management Updated On Fri, Apr 25th, 2025 by Saurenergy Perform the daily operations of plants to ensure reliability and consistency on the production line. Includes Service Shops. Impacts departmental operations and responsible for planning/execution. The role has some autonomy but is focused on execution of activities within an operating discipline covered by standard functional practices and procedures. Some judgment may be required but this […] Read more
MES Engineer Updated On Thu, Apr 24th, 2025 by Saurenergy Define the Industrial Digitalization priorities and objectives:- Defines the Industrial Digitalization priorities and objectives in accordance of PG directives, leading to maximize the Customer Satisfaction and improve the overall operation efficiency on the plant, process development, engineering development, industrial project development; Design and deploy the Industrial Digitalization solutions and standards:- Designs the specifications of new […] Read more
Deputy Manager – Process/Manufacturing Engineering Updated On Thu, Apr 24th, 2025 by Saurenergy To lead the industrialization of the new P1 To improve the production efficiency (machine & Direct Labor) in its perimeter Capitalize and share the know-how of industrial processes in his domain To participate on the design of new equipment and new lines To lead Lean design workshop Industrialization:- To manage production equipment introduction using IPROM […] Read more
Unravelling The Mess At Gensol-Speed Essential Updated On Thu, Apr 24th, 2025 by Saurenergy A report in business daily Mint has finally raised the issue of embattled solar EPC firm Gensol’s recent tender wins, and the likely future of those projects. The report cites sources close to the matter at the government as saying that all options, including rebidding are on the table. At SaurEnergy, we have also been […] Read more
With Hit On 810 MW Offshore Project, RE Hopes In US Get Rude Shock Updated On Wed, Apr 23rd, 2025 by Saurenergy While there was little doubt about the antipathy of the incoming Trump administration to renewable energy, built around unsubstantiated allegations without basis in science or data, it has taken a proper brake on a key project to wake up renewable energy sector to the risks they face now. The project in question is an 810 […] Read more
Lead Engineer – Substation Electrical Design Updated On Wed, Apr 23rd, 2025 by Saurenergy We are seeking a Lead Substation Electrical Design Engineer for Solar PV Project for our design team. This role is responsible for design and engineering the solar ground project. Responsibilities:- Carrying out HV/ EHV substation design and drafting for substations from 66kV to 220kV. Experience in substation designs/Drafting from EHV substation designs, Switchyard layouts experience is must. […] Read more
Wind Industry Creates New Record In 2024 Despite Instability: GWEC Updated On Wed, Apr 23rd, 2025 by Saurenergy The Global Wind Energy Council’s flagship Global Wind Report released today shows that 2024 was a record year for new capacity, with 117 GW of wind energy installed across the world. However, GWEC warned of increasing policy instability in some markets, and pointed to the need to improve permitting, grid transmission and auctioning mechanisms to […] Read more
Adani Ends Up With 8534 MW From Mfg. Linked Tender, Azure Left With 1667 MW Updated On Mon, Apr 21st, 2025 by Saurenergy In a petition before the Central Electricity Regulatory Commission (CERC) where the commission finally stayed away from any comment or order, SECI has allocated 8534 MW out of the total 12000 MW to Adani Green, while Azure Power, which had won 4000 MW in comparison to Adani’s 8000 MW in the same tender, has been […] Read more