SUBSCRIBE NEWS LETTER

information about solar energy

Torrent Power Issues RfS for Purchase of Power of 300 MW from Solar Projects in Gujarat

Torrent will sign power purchase agreement (PPA) with the successful bidders for a period of 25 years from the scheduled commercial operation date of the project. Torrent Power has issued a Request for Selection (RfS) for procurement of power through competitive bidding process followed by e-reverse auction up to 300 MW from grid-connected solar photovoltaic […]

Read more

Assam Issues Tender for 70 MW Solar Project in Amguri Solar Park

APGCL has fixed the upper ceiling for quoted tariff at Rs 3.50/kWh The Assam Power Generation Corporation Limited (APGCL) has issued a tender inviting Request for Proposal (RFP) from interested power producing companies/solar developers for the allotment of 70 MW of Grid-Connected ground-mounted solar photovoltaic projects to be implemented in Amguri Solar Park in the state […]

Read more

MNRE Issues Tender for Ignitability Test Facilities for Solar Module at NISE

The last date of bid submissions is 25th February 2019 and the technical bids will open on the same date. The National Institute of Solar Energy (NISE), an autonomous institute under the Ministry of New and Renewable Energy (MNRE), has invited tenders in two parts (Technical and Commercial) for setting up of Ignitability tests facilities […]

Read more

Chhattisgarh Issues Terms & Condition for Distributed Solar Projects

If a project installed at consumer’s premises delivers excess electricity to the DISCOM, the DISCOM will procure such excess energy generated at the end of the settlement period at the rate of Rs 1/kWh. The Chhattisgarh State Electricity Regulatory Commission (CSERC) has issued its CSERC Regulation 2019 (terms and conditions for distributed solar projects in the […]

Read more

Amendments to Guidelines for Tariff Based Bidding on Solar Projects

MNRE has made amendments to the guidelines for the bidding process of solar photovoltaic projects. Issuing changes in the bid submission deadline, the period of financial closure and commissioning period   The Ministry of New and Renewable Energy (MNRE) has issued a notification with amendments to the guidelines for the tariff-based competitive bidding process for […]

Read more

List of BIS Standards Applicable for Components of Solar PV Applications Issued

The list includes six products along with Indian Standard Number and the Title of Indian Standard. The Ministry of New and Renewable Energy (MNRE) has also issued the list of BIS standards applicable for components of solar PV applications. The list includes six products along with Indian Standard Number and the Title of Indian Standard. […]

Read more

MNRE Issues Technical Specifications for 12 W White-LED based Solar Street Lighting System

The government said in a notification that, indigenously manufactured PV module should be used in the system. The Ministry of New and Renewable Energy (MNRE) has issued technical specifications for 12 W White-LED based solar street lighting system. The government said in a notification that, indigenously manufactured PV module should be used in the system. […]

Read more

MNRE Extends BIS Certification Deadline for Solar Inverters till June 30, 2019

It further added that, “These manufacturers will be allowed self-certification without submitting samples to test labs as the series guidelines for submitting samples to test labs are under preparation.” In a bid to provide relief to the industry, the Ministry of New and Renewable Energy (MNRE) has further extended the deadline for the Bureau of […]

Read more

SECI Issues RfS for 1200 MW Wind-Solar Hybrid Power Projects

The maximum tariff payable to each WPD is fixed at Rs 2.85/kWh for the entire term of 25 years. State-owned Solar Energy Corporation of India (SECI) has issued Request for Selection (RfS) document for setting up of 1200 MW ISTS connected wind power projects (Tranche-VI) on “Build Own Operate” basis. This 1200MW solar-wind hybrid tender […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll