Junior Engineer – Electrical (Solar EPC) Updated On Fri, Feb 28th, 2025 by Saurenergy Responsibilities:- Electrical Installations & Supervision:- Assist in the installation of solar modules, inverters, AC/DC cables, and transformers. Support cable routing, trenching, and electrical panel connections. Monitor the installation of earthing, lightning protection, and switchgear. Testing & Quality Assurance:- Conduct basic electrical testing (IR, continuity, voltage drop) under Ensure proper tagging, termination, and connections as per […] Read more
Junior Engineer – Civil (Solar EPC) Updated On Fri, Feb 28th, 2025 by Saurenergy Responsibilities:- Site Supervision & Execution:- Assist in civil construction activities for solar power plants, including foundation works, roads, drainage, and fencing. Support land grading, excavation, and site leveling based on project Supervise pile foundations, RCC structures, and mounting system installations. Ensure adherence to construction schedules and quality standards. Coordination & Quality Control:- Work closely with […] Read more
Green Stocks Feb 28: High Fliers Continue To Be Pulled Down Updated On Fri, Feb 28th, 2025 by Saurenergy Even as markets continued to haemorrhage through new ‘bottoms’ every week, this one has been a particularly tough week for our green pack too. All stocks falling on any day is no longer the rarity it was just a month ago, and today was no exception. Reliance backed Sterling and Wilson Renewable and Waaree Renewable […] Read more
News Briefs Feb 28: Sungrow In Sweden, Australia’s $25 M For Solar In Apts, Meta’s 396 MW Deal Updated On Fri, Feb 28th, 2025 by Saurenergy Sungrow Powers One Of The First Hybrid Solar Parks In Halmstad Sungrow was a key part of the commissioning of Sweden’s first hybrid solar parks, which have been successfully deployed in Halmstad. Sungrow is providing the inverters and the Energy Storage System (ESS). Developed by Solarwork Sverige and Powerworks Energy, the hybrid solar park is […] Read more
Adani Fast-Tracks Khava RE Project, Commissions 275 MW Solar Project Updated On Fri, Feb 28th, 2025 by Saurenergy Adani Green Energy Twenty Five A Limited, a subsidiary of the Adani Green Energy, operationalized an incremental 275 MW of solar power project at Khavda, Gujarat. The company said in a regulatory filing, “With commissioning of this plant, AGEL’s total operational renewable generation capacity has increased to 12,258.1 MW.” The commissioning follows a 250 MW […] Read more
Low Tariffs, Land Issues Limit Wind Auctions to 5.2 GW in FY23-25: CRISIL Updated On Fri, Feb 28th, 2025 by Saurenergy India’s annual wind power capacity addition will more than double to 7.1 GW on average in the next two fiscal years, compared with 3.4 GW in fiscal 2023-25. This can take the installed wind capacity up to ~63 GW by fiscal 2027, according to CRISIL research. However, capacity additions over fiscal years 2023-25 continued to […] Read more
Senior Project Engineer -HV/MV Updated On Fri, Feb 28th, 2025 by Saurenergy Currently we are looking for a Senior project engineer -HV/MV in India to be part of our global team working together towards our vision – Improving our future. As our Senior project engineer -HV/MV you will be responsible for coordination and progress monitoring of all technical submittals from project structuring through to technical handover on a dedicated project which shall be a utility scale […] Read more
Fronius Launches ‘Reserva’, Its Battery Storage System Updated On Fri, Feb 28th, 2025 by Saurenergy Austrian solar energy firm Fronius, known mostly for its solar inverters until now, has launched the Fronius Reserva. The Reserva is Fronius’s own battery to go woth inverters and use in solar systems, for a range between 6.3 and 15.8kWh. “We believe in a future in which renewable energies cover 100 percent of the world’s […] Read more
First Solar Q4 Results Continue To Wait On India Surge, Ships 14.1 GW Worldwide Updated On Fri, Feb 28th, 2025 by Saurenergy First Solar, Inc. has announced financial results for the fourth quarter and year ended December 31, 2024. The US-based company’s net sales for the fourth quarter were $1.5 billion, an increase of $0.6 billion from the prior quarter. The increase was primarily a result of increased module sales in the fourth quarter. In an earnings […] Read more