CATL, Sinopec Join Hands To Build Battery Swapping Stations Updated On Thu, Apr 3rd, 2025 by Saurenergy Contemporary Amperex Technology Co. Ltd. (CATL) and China Petroleum & Chemical Corporation (Sinopec) have signed a cooperation framework agreement in Beijing, committing to a long-term partnership to develop a nationwide battery-swapping ecosystem. Under the agreement, the companies plan to complete at least 500 battery swap stations this year, with a long-term goal of reaching 10,000 […] Read more
Indian Railways Speeds Up Solar Installs, Lags Broader Targets Updated On Thu, Apr 3rd, 2025 by Saurenergy Indian Railways has so far installed about 209 MW of solar plants on 2,249 Railway stations and service buildings across the country . The Indian Railways Solar Power expansion reached 2,249 installations units with 1489 added in the last five years, 2.3 times more than 628 in the previous five years. Rajasthan Leads in Solar […] Read more
Sales Support Engineer Updated On Thu, Apr 3rd, 2025 by Saurenergy A Sales Support Engineer plays an important role in a company as they are responsible for ensuring that customer requests are met with the highest level of technical accuracy and precision. They work closely with the sales team and customers to understand project specifications, analyze CAD files, and design preliminary hot runner systems using 3D […] Read more
Credence Gets BIS Certification For 730Wp TOPCon Modules Updated On Thu, Apr 3rd, 2025 by Saurenergy Indian solar module manufacturer Credence Solar has received Bureau of Indian Standards (BIS) certification for its latest 730Wp TOPCon-based solar modules, the company announced in a media statement. With this milestone, Credence Solar joins a select group of Indian manufacturers certified for producing some of the country’s most efficient solar panels. The company told Saur […] Read more
BIM Technician/BIM Engineer (Revit Electrical) Updated On Thu, Apr 3rd, 2025 by Saurenergy Model building and drawings of building services elements for Electrical services like lighting power, earthing and lightning protection systems, schematics, schedules, etc 3D model of physical substation in Revit and preparing 2D drawings. Basic electrical design calculations. QA/QC procedures Attention to quality and technical correctness Smooth coordination with other Mechanical, Structural and Architectural services Work […] Read more
Piping Material Design Engineer Updated On Thu, Apr 3rd, 2025 by Saurenergy Responsibilities:- Candidate should be proficient in Piping Materials with experience in engineering consultancy on industrial design projects like chemical, pharmaceutical, bulk drugs, etc. Comprehension of client / project requirements for timely completion and submission of project deliveries. Possess good knowledge of Codes like ASME B31.3, ASME B31.12, ASME B31.1, related ASTM / API / BS […] Read more
Avaada Slips Up As CERC Upholds Cancellation Of Connectivity in MP Wind Projects Updated On Thu, Apr 3rd, 2025 by Saurenergy The Central Electricity Regulatory Commission (CERC), in an order dated March 30 involving Avaada Energy and Central Transmission utility (CTUIL), passed an order that censures both the parties involved. For Avaada, the blow is heavier because the CERC eventually upheld the decision of the CTUIL to cancel the connectivity license accorded to Avaada for its […] Read more
SPML Infra In Tie-Up With Energy Vault To Make, Deploy Batteries In India Updated On Wed, Apr 2nd, 2025 by Saurenergy New Delhi based SPML Infra Limited has signed a licensing and royalty agreement with leading storage solutions firm Energy Vault. For SPML Infra, with its hitherto specific focus on India’s water and energy infrastructure, the tie-up marks a significant push into the energy infrastructure space, where it has had a small but significant presence until […] Read more
DM / Manager – Project Management Updated On Wed, Apr 2nd, 2025 by Saurenergy Manage operationally and functionally the Projects he/she is assigned to:- Manage OEM/OES Projects (Component, System with known technology components, …) Is responsible for the achievement of the Project KPI in terms of profitability (both product/development vs Development Activity Payback and Extended Margin), Quality and Production Preparation Secure Project resources and control them Drive the Associated […] Read more