APTEL Sets Aside KERC Order, Restores Benefit To Solar Developer Updated On Tue, Aug 17th, 2021 by Saurenergy The Appellate Tribunal for Electricity (APTEL) has ruled in favour of a small solar power developer, Hunsankodilli Solar Power Project LL.P (developer) that has set up a 3 MW solar plant in Karnataka. The ruling follows a similar one declared early in August where the apex authority had taken a similar view. The developer had […] Read more
Canadian Solar Reports $1.43 Billion Revenues in Q2 FY21, a 105% YoY Increase Updated On Tue, Aug 17th, 2021 by Saurenergy Canadian Solar Inc. has announced its financial results for Q2 FY21 with strong revenues of $1.43 billion. The firm reports that net revenue in the Q2 FY21 grew by 105% YoY and 31% QoQ to $1.43 billion. The sequential improvement was driven by an increase in module shipments and average selling price (ASP), growth in […] Read more
Scotland’s Firth of Forth Net Zero Hub Key for Climate Goals: WoodMac Updated On Tue, Aug 17th, 2021 by Saurenergy The development of net zero hubs around the UK has proved a key plank of the country’s strategy towards achieving net zero by 2050. Scotland, which has a 2045 net-zero target, could advance its ambitions by establishing a net zero hub on the Firth of Forth, research from global natural resources consultancy Wood Mackenzie. “Net […] Read more
Bangladesh Invites Bids for 68 MW Solar Project in Sirajganj Region Updated On Tue, Aug 17th, 2021 by Saurenergy The Bangladesh-China Renewable Energy Company (BCRECL) has invited bids for the engineering, procurement, and construction (EPC) of a 68 MW solar energy project on a turnkey basis in Sirajganj, Bangladesh, including the construction of a 15 km 132 kV double circuit transmission line with a substation bay. BCRECL is a joint venture between the North-West […] Read more
MoP Issues Draft Electricity Rules 2021 for Green Energy Updated On Tue, Aug 17th, 2021 by Saurenergy The Ministry of Power has released the “Draft Electricity (promoting renewable energy through Green Energy Open Access) Rules, 2021,” seeking comments from stakeholders within 30 days. The draft rules can be accessed here. These rules are proposed for the purchase and consumption of green energy, including the energy from ‘Waste-to-Energy’ plants. The draft rules address […] Read more
High Cost, Infrastructural Issues Limit Green Hydrogen’s Role in Energy Transition: Study Updated On Tue, Aug 17th, 2021 by Saurenergy Green hydrogen is recognised as a viable solution for reducing greenhouse gas emissions and transitioning away from fossil fuels for “hard-to-abate” sectors. The supply chain for hydrogen, however, is not yet fully developed. Several barriers, such as the high cost of green hydrogen compared to non-renewable alternatives and the lack of dedicated infrastructure, are still […] Read more
SJVN Wins Bihar’s 200 MW Solar Project Auction Worth Rs. 1,000 Crore Updated On Mon, Aug 16th, 2021 by Saurenergy A joint venture of Govt. of India & Govt. of Himachal Pradesh, SJVN on Saturday announced winning the auction for 200 MW of Grid-Connected Solar Project of Rs, 1,000 crores in Bihar. According to SJCN’s Chairman Mr. Nand Lal Sharma, SJVN Ltd got the project through Open Competitive Tariff Bidding Process for quoted capacity of […] Read more
33 GW Pumped Hydro Storage Projects to be Set Up in Andhra Pradesh Updated On Mon, Aug 16th, 2021 by Saurenergy The Andhra Pradesh energy department will install Pumped Hydro Storage Power Projects (PSP), with 33.24 GW total capacity, across 1.45 lakh acres in Kadapa, Kurnool and Anantapur districts. Energy secretary Srikant Nagulapalli believes these pumped hydro storage power will improve the power supply position in the state. “These will enable the consumers to get quality […] Read more
Sterling and Wilson Solar Q1 Results. Underwhelming Updated On Mon, Aug 16th, 2021 by Saurenergy Sterling and Wilson Solar Limited (SWSL) (BSE Scrip Code: 542760; NSE Symbol: SWSOLAR), one of the leading solar EPC and O&M solutions provider, announced its unaudited financial results for the quarter ended 30th June 2021. The Company’s consolidated revenue from operations for Q1FY22 stood at Rs. 1,195 crore and adjusted gross margins stood at Rs 28 […] Read more