BPCL Floats Tender For 14MW AC / 18MW DC Grid Connected Solar Power Updated On Fri, Aug 5th, 2022 by Saurenergy Bharat Petroleum Corporation Limited (BPCL) invites electronic-bids (e – tender) for setting up of “14MW AC/18MW DC Grid Connected Solar Power Plant on Lumpsum Turnkey (LSTK) basis at Bina, District-Sagar, Madhya Pradesh. The last date for submitting the bid for this 298 MW solar power project is August 24, 2022, till 3:00 pm and bids […] Read more
Adani Green Earnings Call Q1 FY23: Operational Capacity Growth Up To 5800 MW Updated On Thu, Aug 4th, 2022 by Saurenergy Kev revelations were made during the Q1 FY23 earnings call of the green arm of Adani Enterprises, Adani Green Energy Limited (AGEL). Here is a look at them- Capacity Growth On An Upward Trend The operational capacity growth on YoY basis has shot up by 65% to 5800 MW. This growth has been attributed to […] Read more
Parliamentary Committee Disappointed With Ministry Over Delay In Solar Park Projects Updated On Wed, Aug 3rd, 2022 by Saurenergy Earlier this year, the Government had implemented a slew of schemes to pave the way for the establishment of 50 solar parks of aggregate capacity of 40,000 MW. Needless to say, this would have brought cheer to solar power project developers while taking up the country’s solar power capacity by several notches. A few months […] Read more
IOC Wants Green Hydrogen To Meet 10% Of Energy Requirements By 2030 Updated On Wed, Aug 3rd, 2022 by Saurenergy State-owned Indian Oil Corporation (IOC) has said in its annual report that the multinational PSU wants to replace a tenth of its grey hydrogen produced with the use of fossil fuels in its refineries with green hydrogen which is carbon free. The decision is aimed at de-carbonization efforts of the company. Today, the petroleum refining […] Read more
EVA Sheet: An Important Constituent of a Solar Module; Explained Updated On Mon, Aug 1st, 2022 by Saurenergy Apart from solar cells, a solar module consists of many components protecting or prolonging the lives of the cells. A standard module consists of a Frame on outer edges, glass sheet, and Ethylene Viny Acetate (EVA) sheet above the solar cells. Cells are covered from lower side again with an EVA sheet before hard and […] Read more
NTPC Q1 Results, Revenues up 43% YoY, Profits up 15% Updated On Fri, Jul 29th, 2022 by Saurenergy NTPC Limited, India’s largest power generator and the engine of it’s future renewable growth plans, has reported results for the Q1 of FY 23. The consolidated results have come out with a strong topline growth in revenues, even as profit growth was somewhat muted, due to the impact of higher input costs, especially coal. At […] Read more
NLC India Floats 500MW Solar Tender (ISTS-Connected) On Pan-India Basis Updated On Wed, Jul 27th, 2022 by Saurenergy Neyveli Lignite Corporation Limited (NLC) India has invited bids for the setting up of 500 MW ISTS connected Solar Power Project on pan-India basis. The last date for submitting the bid for this 500 MW solar power project is August 24, 2022, and bids will be opened on the same day. NLC India (Neyveli Lignite […] Read more
With 90% Growth In PAT In Q1 FY23, Tata Power Rides 48% Jump In Revenues Updated On Tue, Jul 26th, 2022 by Saurenergy One of India’s largest integrated power companies, Tata Power has today announced its results for Q1FY23 reporting a 90% YoY increase in consolidated quarterly PAT as compared to Q1FY22, registering its 11th consecutive year-on-year quarterly growth in PAT. Quarterly Highlights – Q1FY23 Tata Power’s consolidated PAT before Exceptional Items is up by 90% at ₹884 crore […] Read more
Project Engineers for Water Front Support Locations Updated On Fri, Jul 22nd, 2022 by Saurenergy Bharat Electronics Limited, a Navratna Company and India’s Premier Professional Electronics Company under Ministry of Defence, its Hyderabad Unit requires the following personnel on temporary basis as Project Engineer-I for deployment at Water Front Support Locations. 1. REQUIREMENT OF ENGINEERS:- Post Place of Posting Number of Posts Upper Age Limit as on 01.07.2022 […] Read more