Manufacturing-Linked Tender
Adani Ends Up With 8534 MW From Mfg. Linked Tender, Azure Left With 1667 MW
Azure Power Announces Suspension of SEC Reporting Obligations
Andhra Govt Finally Withdraws 6400 MW Tender, Sticks With Buy From SECI
AGEL Signs 4667 MW PPA, Manufacturing Linked Project Moves Into High Gear
Azure Power Signs PPA's For 600 MW With SECI For Its 4 GW Mfg. Linked Projects
KSERC Approval for 300 MW Solar Buy Exposes Multiple Challenges Facing SECI, Developers
SECI's 1000 MW PSA Signing with TANGEDCO, Vital Step Forward For Mfg. Linked Tender Winners
Azure Power Hopeful of No Price Markdowns As PSA's Finally Start on Its 4 GW Mfg Linked Win