R&D Lab Engineer Updated On Tue, May 27th, 2025 by Saurenergy To check reliability of solar PV modules and perform test like (Module breakage tester, Mechanical load tester, Hail tester, Water leakage tester , UV test, Damp heat test, PID test, Thermal cycling test, Humidity freeze test & Bypass diode test). To Prepare Document and Report Qualification and Experience:- BE /Diploma Electrical /EC Exp.2-4 Year Preferable […] Read more
Data analysis (IV & FTR) Updated On Tue, May 27th, 2025 by Saurenergy Prepare final test report (FTR) and report to management. Good knowledge of Computer and Excel. Qualification and Experience:- BE /Diploma Electrical /EC Exp.1 Year Preferable Solar Experience or Fresher can also apply Location:- Mehsana, Gujarat. Company Overview:- Established in 1998 as a proprietary concern and now listed concern, headquartered in Ahmedabad, Gujarat, India, Ganesh Green […] Read more
PM To Kick Off ₹53,400 Cr Bhuj Projects, Khavda Renewable Energy Park Updated On Mon, May 26th, 2025 by Saurenergy Prime Minister Narendra Modi will lay the foundation stone and inaugurate development projects worth more than ₹53,400 crore in Bhuj in Gujarat, with a focus on infrastructure, power, and renewable energy. Key announcements include transmission projects to evacuate renewable power from the Khavda Renewable Energy Park, expansion of the transmission network, and a new ultra-supercritical […] Read more
Lower C&I Tariffs, Residential Support Can Boost RE Shift: CEEW Updated On Fri, May 23rd, 2025 by Saurenergy A new report by the Council on Energy, Environment, and Water (CEEW) and the Alliance for an Energy-Efficient Economy (AEEE) finds that power pricing reforms can drive equitable and scalable electrification. The report highlights that reforms promoting greater rooftop solar penetration in residential buildings and rationalised tariffs for commercial and industrial users are key to […] Read more
With Hybrid Push, Oyster Renewable Aims 2 GW Capacity Updated On Fri, May 16th, 2025 by Saurenergy India-based Oyster Renewable Energy is aiming to commission 2 gigawatts (GW) of renewable energy capacity by 2030, with a sharp focus on the commercial and industrial (C&I) sector, the company said in an interaction with Saur Energy. The independent power producer, founded in 2021, is building a portfolio of hybrid wind-solar projects across several Indian […] Read more
Shakti Pumps’ Profit Nearly Triples In FY25, Revenues Up By 84% Updated On Sat, May 10th, 2025 by Saurenergy Indore-based Shakti Pumps (India) Limited, a manufacturer of solar-powered water pumping systems, has reported an outstanding financial performance for the fiscal year ended March 31, 2025. The company registered an 84.3% year-on-year (YoY) growth in annual revenue and nearly tripled its net profit, underscoring strong demand momentum and efficient execution across its operations. Quarterly results […] Read more
Kosol Energie Plans Lab To Test Long Durability Of Modules Updated On Fri, May 9th, 2025 by Saurenergy Indian solar manufacturer Kosol Energie has now planned a dedicated lab to test the durability and reliability of solar modules. The top management of the firm told Saur Energy about their steps towards boosting research and development on solar modules. Nitin Sangle, CEO of Sunray Solar, the solar vertical of Kosol Energie said the lab […] Read more
India’s Renewable Energy Sector Sees Surge In FDI: CEEW Updated On Thu, May 8th, 2025 by Saurenergy India’s renewable energy sector accounted for nearly 8 percent of total foreign direct investment (FDI) inflows in the financial year 2024-25, up from about 1 percent in FY21. The trend was revealed in the latest Market Handbook released by the Council on Energy, Environment and Water’s Green Finance Centre (CEEW-GFC). The sector attracted USD 3.4 […] Read more
JSW, UPPCL Sign 1,500 MW Pumped Hydro Storage PPA Updated On Thu, May 1st, 2025 by Saurenergy JSW Neo Energy Limited, a JSW Energy subsidiary, signed a Pumped Hydro Storage Power Procurement Agreement (PHSPPA) with Uttar Pradesh Power Corporation (UPPCL) for the procurement of 1,500 MW / 12,000 MWh of pumped hydro energy storage. The PHS PPA would be used to supply energy storage capacity for 40 years. As per the order, […] Read more