KPI Green Leads Again With Lowest Bid In 500 MW GUVNL Auction Updated On Tue, Jun 11th, 2024 by Saurenergy Surat-based KPI Green Energy (Rs2.67), Avaada Energy (Rs 2.68), Solarcraft Power India -BluPine (Rs 2.69) , Hinduja Renewables and NRC Industries (Rs 2.72) have emerged winners in the 500 MW solar auction from Gujarat Urja Vikas Nigam Limited (GUVNL). The tender, released in March this year, continues the trend of state discoms attracting bids over […] Read more
Programme Associate – Distributed Renewable Energy Updated On Fri, Jun 7th, 2024 by Saurenergy Job Duties and Accountabilities:- Desirable Outcomes (first year):- Lead the team to accelerate adoption of distributed RE in atleast one state and support in other states. Conceptualise and execute atleast one innovative idea to scale up the adoption of DRE in the priority state Take up atleast one institutional responsibility or actively work on one […] Read more
KPI Green Energy Leads Winning Bidders With Rs 3.33 Bid For GUVNL Hybrid Auction Updated On Fri, Jun 7th, 2024 by Saurenergy Gujarat Urja Vikas Nigam Limited (GUVNL)’s 500 MW wind solar hybrid auction finally has a list of winning bidders, with an attractive price of Rs 3.33 achieved after the while process. Surat based KPI Green Energy led with the lowest bid, followed by Juniper Green Energy with a Rs 3.34 bid. JSW Green Energy and […] Read more
REC Trading At IEX Skyrockets, Sees 640% Growth In May Updated On Thu, Jun 6th, 2024 by Saurenergy The trading of Renewable Energy Certificates (REC) seems to have escalated at the Indian Energy Exchange (IEX), the power exchange data shows. The publicly-listed power exchange firm recently shared its data on the trading of its different products including RECs. IEX said that the renewable energy certificates (REC) trading in May stod at 1,055 MUs. […] Read more
REC Prices At Power Exchanges Take A Dip After Tweak In Rules Updated On Wed, Jun 5th, 2024 by Saurenergy With a tweak in the regulations related to Renewable Energy Certificates (RECs), the Indian Power Exchanges has seen its increased trading. The domestic power exchanges like IEX claimed that with an increase in its trading, the prices of the same have shrunk. The top management of IEX in its recent investors call told its investors […] Read more
Bihar Proposes To Reduce Timelines For Rooftop Solar Installations Updated On Tue, Jun 4th, 2024 by Saurenergy The Bihar Electricity Regulatory Commission (BERC) has now come up with its latest draft regulation to pave the way for reduced timelines for rooftop solar projects. This comes after the Union government is pushing residential rooftop projects with increased subsidies and ambitious targets. The state commission has issued the draft paper and asked the stakeholders […] Read more
UPERC Amends Rules To Expedite Rooftop Solar Installations Updated On Fri, May 31st, 2024 by Saurenergy The Uttar Pradesh Electricity Regulatory Commission (UPERC) has now amended its existing rooftop solar rules of 2019 to pave the way for faster installations of rooftop solar systems. As per the revised rules, the state commission has mandated the state discoms to complete the process of Technical Feasibility Reports (TFRs) within 15 days. The Commission […] Read more
GERC Proposes Fixing Timelines For Rooftop Solar Connections Updated On Fri, May 24th, 2024 by Saurenergy The Gujarat Electricity Regulatory Commission (GERC) has now proposed amending its existing rooftop solar and net-metering rules of 2016 to pave the way for fixing timelines for rooftop solar installations. The new draft rules proposed that the technical feasibility report (TFR) should be submitted by the discoms within 15 days. This new provision was made […] Read more
PGVCL Allocates 479 MW Capacity Solar Projects Under PM KUSUM-C Updated On Thu, May 23rd, 2024 by Saurenergy Paschim Gujarat Vij Company Ltd has allocated 479 MW solar projects to several developers under component C of the PM Kusum programme. The awarded projects are expected to be operational by the end of December 2024. The highest capacity was allocated to Onix Renewable followed by Indian Infrastructure and Project India. The tariffs that were […] Read more