SECI Issues RfS for 1200 MW Wind-Solar Hybrid Power Projects Updated On Wed, Jan 2nd, 2019 by Saurenergy The maximum tariff payable to each WPD is fixed at Rs 2.85/kWh for the entire term of 25 years. State-owned Solar Energy Corporation of India (SECI) has issued Request for Selection (RfS) document for setting up of 1200 MW ISTS connected wind power projects (Tranche-VI) on “Build Own Operate” basis. This 1200MW solar-wind hybrid tender […] Read more