GE Renewable Energy signs first Cypress order in Spain Updated On Mon, Dec 7th, 2020 by Saurenergy GE Renewable Energy announced today that it has been selected by Azora to supply 19 Cypress onshore wind turbines for the 100 MW Cuevas de Velasco wind farm located in the Cuenca province in Spain. Azora will operate the Cypress turbines at 5.5 MW, with a rotor diameter of 158m, the most powerful ever permitted […] Read more
Vestas Wins 534 MW Order in Brazil to Extend Casa dos Ventos’ Wind Park Updated On Mon, Dec 7th, 2020 by Saurenergy With reference to company announcement no. 43/2020 of 1 December 2020, Casa dos Ventos, one of the pioneers and largest investors in the development of wind projects in Brazil, has placed a 534 MW order for the second stage of the of the Rio do Vento complex, located in the state of Rio Grande do […] Read more
Senvion Enters Agreement to Sell 100% of its Indian Operations Updated On Fri, Dec 4th, 2020 by Saurenergy Senvion GmbH has entered into contractual agreements for the sale of 100 percent of its Indian operations i.e. Senvion India Senvion GmbH has announced that it has entered into contractual agreements for the sale of 100 percent of its Indian operations i.e. Senvion India on December 1, 2020. Senvion had previously ring-fenced the Senvion India […] Read more
Vietnam’s Position as Leading Wind Market in Southeast Asia is Under Threat: GWEC Updated On Fri, Dec 4th, 2020 by Saurenergy The Global Wind Energy Council (GWEC) appreciates the recent decision by the Vietnamese government to approve an extension of the Feed-in Tariff (FIT) scheme for wind power in the country. However, the proposed reduction to the FIT risks damaging the growth of Vietnam’s promising wind power sector by slowing down investment, the creation of new […] Read more
Ørsted Appeals Against Danish Tax Agency Decision on 2 Offshore Wind Farms in the UK Updated On Thu, Dec 3rd, 2020 by Saurenergy Today, Ørsted received an administrative decision from the Danish Tax Agency requiring Danish taxation of the company’s British offshore wind farms Walney Extension and Hornsea 1 in the tax years 2015 and 2016. The Danish Tax Agency’s claim amounts to DKK 5.1 billion, plus interest amounting to DKK 1.5 billion. According to the decision, Ørsted is to […] Read more
Vestas wins 328 MW order for two wind projects in Australia Updated On Fri, Nov 27th, 2020 by Saurenergy In partnership with Global Power Generation, a subsidiary of the multinational power company Naturgy Group, Vestas has secured a 328 MW deal for two wind projects in Victoria, Australia. The order includes supply and installation of 52 V136-4.2 MW wind turbines for the Ryan Corner Wind Farm as well as the engineering, procurement and construction of […] Read more
Leeward Renewable Energy Completes Repowering of Sweetwater 3 Wind Farm Updated On Wed, Nov 25th, 2020 by Saurenergy Leeward Renewable Energy, has announced the successful completion, in late September, of the repowering and final financial close of its Sweetwater 3 Wind Farm (“Sweetwater 3”) in Nolan County, Texas. Leeward procured the wind turbine equipment from GE Renewable Energy, which also provided construction services and is providing operations and maintenance services for the project. […] Read more
Meteorological Factors Caused Unexpected Drop in India’s Wind Production: Analysis Updated On Tue, Nov 24th, 2020 by Saurenergy Wind power production in India in Q2 and Q3 saw an unexpected drop due to low wind speeds caused by regional and global meteorological factors. A new analysis by US-based consultancy firm, ArcVera Renewables has found that wind power production in India in the second (Q2) and third quarter (Q3) of the current financial year saw an unexpected […] Read more
Boralex Becomes the Sole Owner of 3 Quebec Wind Farms, with 296 MW Capacity Updated On Mon, Nov 23rd, 2020 by Saurenergy Boralex Inc has announced that it has entered into a definitive agreement to acquire the full 49% equity stake held by the Caisse de dépôt et placement du Québec (CDPQ) in 3 wind farms in Quebec, already 51% owned by Boralex. CDPQ’s 49% equity stake represents 145 MW net installed capacity and the three wind […] Read more