Ladakh’s 13 GW Solar Dream Alive, Rs. 1,080 Cr Awarded For RDSS: Power Minister Updated On Fri, Nov 22nd, 2024 by Saurenergy Union Minister of Power and Housing and Urban Affairs, Manohar Lal, reviewed the functioning of the power and housing departments during a three-day visit to Ladakh at Leh, Union Territory (UT). The minister was also briefed on the much delayed 13 GW solar plans for Ladakh, something he duly shared with the media as well. […] Read more
Ladakh: NTPC, Indian Army Set To Build Solar Hydrogen Microgrid Project Updated On Fri, Oct 25th, 2024 by Saurenergy NTPC has partnered with the Indian Army to establish a Solar Hydrogen-based Microgrid at Chushul, Ladakh. This would provide a stable power supply using Green Hydrogen in off-grid Army locations. The Defence Minister Rajnath Singh laid the foundation stone of this unique project through video conferencing. NTPC has designed this solar hydrogen-based microgrid system to […] Read more
SECI Issues Tender To Establish Solar Project In Ladakh Updated On Mon, Jul 29th, 2024 by Saurenergy In a bid to increase solar projects in the Leh region of the Union Territory (UT) of Ladakh, the Solar Energy Corporation of India (SECI) released a tender seeking bids to develop a 12 MW solar PV power plant system at Phey, Leh, UT of Ladakh. SECI said that the last date to submit bids […] Read more
Polaris Receives 7,700 Cr. Order To Deploy Smart Meter In India Updated On Wed, May 8th, 2024 by Saurenergy Polaris has been awarded a Rs. 2,246 crore contract to install 2.2 million smart meters in West Bengal. Their project aims to reduce losses for DISCOMs and empower consumers by introducing smart prepaid meters. With this order, Polaris has closed orders of over INR 7,700 Crores across the geographies of Uttar Pradesh, West Bengal, Manipur, […] Read more
SECI Issues Bid For 20 MW Solar Plant With BESS In Leh Updated On Tue, Apr 23rd, 2024 by Saurenergy Solar Energy Corporation of India (SECI) has issued a tender inviting bids for design, engineering, supply, construction, erection, testing, commissioning, and operation and maintenance (O&M) of a 25 MW solar power project with a 20 MW/50Mh battery energy storage system at Taru, Leh in Ladakh. According to the tender document issued by SECI, the scope […] Read more
MNRE Notifies Guideline For 13 GW RE, 12GWh BESS Projects In Ladakh Updated On Tue, Feb 20th, 2024 by Saurenergy The Cabinet Committee on Economic Affairs (CCEA) in its notification shared the recent President’s sanction for the implementation of a 13 GW renewable energy project in Ladakh (IST GEC – II). The long awaited project comprises of 13 GW renewable energy capacity along with a 12GWh Battery Energy Storage system (BESS) in Ladakh. The government […] Read more
Cabinet Approves Plan For 13 GW Of Renewable Project In Ladakh Updated On Wed, Oct 18th, 2023 by Saurenergy The Cabinet Committee on Economic Affairs, chaired by the Prime Minister, Narendra Modi, today approved the project on Green Energy Corridor (GEC) Phase-II – Inter-State Transmission System (ISTS) for 13 GW Renewable Energy Project in Ladakh. The project is targeted to be set up by FY 2029-30 with total estimated cost of Rs 20,773.70 crore […] Read more
KREDA Issues Tender for Solar Battery Banks in Ladakh Updated On Thu, Aug 18th, 2022 by Saurenergy Kargil Renewable Energy Development Agency (KREDA) has floated a tender for supply, Installation and commissioning of solar tubular gel battery banks of various capacities at various locations across the Kargil District in the union territory of Ladakh. A high-performance tubular gel battery with a polypropylene copolymer container should be used. A pressure regulation valve should […] Read more
NHPC To Catalyze Green Hydrogen Technologies In Leh, Kargil Updated On Mon, Jul 18th, 2022 by Saurenergy State-owned National Hydroelectric Power Corporation (NHPC) has announced the signing of two Memorandum of Understandings (MoUs) for the establishment of ‘Pilot Green Hydrogen Technologies’ in Leh and Kargil districts of Ladakh. The official statement says that the projects are in keeping with the country’s ambition to mitigate the carbon footprint in the power sector. […] Read more