Advertisment

Uttar Pradesh Invites E-Tender for 38 MW Of Solar PV System

Uttar Pradesh New And Renewable Energy Agency (UPNEDA) has floated a tender for 38 MW of rooftop solar system under MNRE GCRT Phase-2 scheme. 

author-image
Saur News Bureau
Updated On
Uttar Pradesh Invited E-Tender for 38 MW of Solar PV System

A tender for 38 MW of rooftop solar system has been floated by Uttar Pradesh New And Renewable Energy Agency (UPNEDA). This solar project will be executed under The Ministry of New and Renewable Energy (MNRE) GCRT Phase-2 scheme. 

Advertisment

The last date of submitting the bid is July 31, 2022  and the bid will open on the same day.

This 38 MW of rooftop solar tender includes site survey, design, engineering, supply, construction, erection, testing, and commissioning work. The power developer will be responsible for O&M, warranty for five years. UPNEDA has set a target to cover 1,00,000 eesidential consumers which are about 300 MW. 

The interested bidder will have to pay Rs 2.5 Lakh as a bank guarantee, valid for five years from receiving the LOA.

Advertisment

Bidders should not be blacklisted from any of the agencies with direct or indirect control of Central Government Ministries/ Departments/ Public Sector Units (PSUs)/ Institutions, State Government Departments/ Organizations /Institutions, etc. 

The bidder should have designed, supplied, installed & commissioned; Grid-connected Rooftop Solar Projects having an aggregate capacity not less than 100 kWp which should have been commissioned before the Techno-Commercial Bid opening date. 

The bidder shall furnish the performance bank guarantee for installation and commissioning based on the allocated capacity.

The bidder should have a positive net worth at the close of the preceding three Financial years.

Bidders can view/download this UPNEDA (Uttar Pradesh New And Renewable Energy Agency) tender documents consisting of notice inviting tender, invitation to bidders, scope of work, bidding documents, general terms and conditions of contract, erection conditions of contract, annexures, and technical specification here.

Solar Power Solar Energy Renewable Energy MNRE Solar Project India Clean Energy Solar Projects Solar green energy tender UPNEDA Uttar Pradesh New And Renewable Energy Agency 38 MW of rooftop solar system
Advertisment