Advertisment

SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 02 MW (01 MW EACH AT ARMY POST IN SIACHEN AND ARMY POST IN PARTAPUR) AT JAMMU & KASHMIR

author-image
Saur News Bureau
Updated On
35% Drop in Tariff After Commissioning Delay

IT FOR SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 02 MW (01 MW EACH AT ARMY POST IN SIACHEN AND ARMY POST IN PARTAPUR) AT JAMMU & KASHMIR WILL BE UPLOADED ON TCIL PORTAL ON 20/02/2019

Solar Power Solar Energy Renewable Energy
Advertisment