/saur-energy/media/post_attachments/2023/04/hyderabad-growth-corridor-limited.jpg)
Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of cumulative 13 MW (AC) Solar PV Power Plant on rooftop of Cycle track at 2 stretches along the ORR with 5 years Plant O&M
Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of cumulative 13 MW (AC) Solar PV Power Plant on rooftop of Cycle track at 2 stretches along the ORR with 5 years Plant O&M