SUBSCRIBE NEWS LETTER

solar power plants

Azure Power and Hareon Solar Forms Joint Venture to Develop 118 Mw Solar Power Project in Telangana

Hareon Power Singapore Limited, the Singapore subsidiary of Hareon Solar will be collobarating with Azure Power to develop 118 MW solar power project in Telangana. Hareon Solar Technology Co., Ltd. will be partnering with Azure Power Global Limited to develop a 118 MW solar power project in India. Hareon will be investing through its Singapore […]

Read more

Kerala Solar Energy Policy

OBJECTIVE Objective of the state solar policy include:- Increase the installed capacity of the solar sector in the State to 500MW by 2017 and 2500 MW by 2030. Contribute to long term energy security of the State of Kerala as well as ecological security by reduction in carbon emission. Adopt a multi-pronged approach in targeting […]

Read more

Jharkhand Solar Energy Policy

Jharkhand Solar Energy Policy Updates 2017 A 50 percent subsidy to residential consumers and a 10 percent subsidy to commercial (industrial) consumers installing rooftop solar will be provided by the Jharkhand State government, the policy was implemented in July 2017. OBJECTIVE The objectives of the Policy are as follows To encourage participation of private sector […]

Read more

Haryana Solar Energy Policy

Haryana Solar Energy Policy Updates 2017 A discussion paper was released by the Haryana Electricity Regulatory Commission (HERC) in July 2017, stating Terms and Conditions for Determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation (RPO) and Renewable Energy Certificate (REC)) Regulations, 2017. The draft mentioned the useful life for solar power projects determined […]

Read more

Jammu and Kashmir Solar Energy Policy

Jammu and Kashmir Solar Energy Policy Updates 2017 The solar rooftop projects aggregating 450MW will be installed in the state by 2022 has been approved by the state cabinet of Jammu & Kashmir as per the solar rooftop policy 2016 to be followed for a 10-year period implemented in accordance with the provisions of Jammu […]

Read more

Uttar Pradesh Solar Energy Policy

Uttar Pradesh Solar Energy Policy Updates 2017 A target of 10,700 MW for solar power, including 4,300 MW from rooftop solar projects, by FY 2022 has been set by the Government of Uttar Pradesh mentioned in the ‘Draft Solar Power Policy-2017’ for Uttar Pradesh in June 2017. At the time of announcing the policy remains […]

Read more

Karnataka Solar Energy Policy

Karnataka Solar Energy Policy Updates 2017 The solar installation target has been changed from 2,000 MW to 6,000 MW by March 2021 as per the amendments to Karnataka Solar Policy 2014-2021 were announced. The changes were made to reflect the new tariff policy and targets fixed for the state by the MNRE. The current installed […]

Read more

Odisha Solar Energy Policy

OBJECTIVE Objectives of Odisha Solar energy policy 2013 includes:- Productive use of wastelands, thereby utilizing the non-industrialized areas that receive abundant sunshine for creation of Solar power hubs. Creating favorable conditions to Solar manufacturing capabilities by providing fiscal incentives. APPLICABILITY LAND BASED SOLAR PROJECTS Various industries, CPPs, IPPs have been allotted with huge chunks of […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll